Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of services for the upgrades of two wastewater pump stations (Pump Stations 4 and 5), including rehabilitation, installation of new pumps, valve vaults, piping, electrical, and instrumentation work in Westport, Washington.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Upgrade two wastewater pump stations. Pump Station 4 work includes: Rehabilitate and revise existing wet well; install new submersible pumps, valve vault, and saddle manhole. Pump Station 5 work includes: Modify existing wet well to serve as an influent manhole; install a new wet well with submersible pumps, valve vault, 12" gravity sewer line between the new wet well and the influent manhole; 12" culvert to allow storm drainage in ditch. Work at both pump stations includes all associated piping, electrical, instrumentation, bypass pumping, and other temp measures.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Upgrade two wastewater pump stations. Pump Station 4 work includes: Rehabilitate and revise existing wet well; install new submersible pumps, valve vault, and saddle manhole. Pump Station 5 work includes: Modify existing wet well to serve as an influent manhole; install a new wet well with submersible pumps, valve vault, 12" gravity sewer line between the new wet well and the influent manhole; 12" culvert to allow storm drainage in ditch. Work at both pump stations includes all associated piping, electrical, instrumentation, bypass pumping, and other temp measures.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of construction of the lift stations 4 & 5 reconstruction. Full replacement of the wet well and valve vault of two lift stations with associated gravity sewer and forcemain improvements, new combination pump control/scada panel, an air release valve replacement, associated pavement replacement and site improvements.
Posted Date
Dec 18, 2025
Due Date
Jan 22, 2026
Release: Dec 18, 2025
Close: Jan 22, 2026
Project consists of construction of the lift stations 4 & 5 reconstruction. Full replacement of the wet well and valve vault of two lift stations with associated gravity sewer and forcemain improvements, new combination pump control/scada panel, an air release valve replacement, associated pavement replacement and site improvements.
AvailableReplacement of existing station pumps, valves, piping, exterior door and cable hoists at pump stations 5, 14, and 38. Electrical upgrades, including building modifications, site lighting, and transfer switches at pump stations 14 and 38. Replacement of miscellaneous metals, piping, and valves at pump station 53. 4.Installation of corrosion control equipment at pump stations 53 and 57.
Posted Date
Nov 19, 2025
Due Date
Jan 8, 2026
Release: Nov 19, 2025
Close: Jan 8, 2026
Replacement of existing station pumps, valves, piping, exterior door and cable hoists at pump stations 5, 14, and 38. Electrical upgrades, including building modifications, site lighting, and transfer switches at pump stations 14 and 38. Replacement of miscellaneous metals, piping, and valves at pump station 53. 4.Installation of corrosion control equipment at pump stations 53 and 57.
AvailableIncrease the hydraulic throughput of the pump station. Complete the design of improvements to increase the hydraulic throughput to a firm capacity of 10,000 GPM (5 x 2,500 GPM) based on n+1 redundancy.
Posted Date
Dec 15, 2025
Due Date
Jan 15, 2026
Release: Dec 15, 2025
Close: Jan 15, 2026
Increase the hydraulic throughput of the pump station. Complete the design of improvements to increase the hydraulic throughput to a firm capacity of 10,000 GPM (5 x 2,500 GPM) based on n+1 redundancy.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →