CityPA
Jul 16, 2026
Closes
Aug 11, 2026
Sidewalk Project (Request for Proposal)
Work inlcudes approx 710 SF 5" depth cement concrete sidewalk; 1 EA ADA curb ramp with detectable warning surface; 1 LS erosion and sedimentation control.
Description: Design-build construction project. The project will generally consist of a well field, centralized storage and high service pump station (hsps) site, a 26-mile transmission main (tm), an intermediate booster station and two point of delivery (pod) sites.
SpecialDistrict · AZ, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
CityPA
Jul 16, 2026
Closes
Aug 11, 2026
Work inlcudes approx 710 SF 5" depth cement concrete sidewalk; 1 EA ADA curb ramp with detectable warning surface; 1 LS erosion and sedimentation control.
CityNJ
Jul 17, 2026
Closes
Aug 18, 2026
Provide qualified engineering companies to complete the design, specifications, construction administration, and inspection services for the uez roadway improvements identified herein;work consists of full consulting engineering services, including labor, materials and every other item of expense necessary to design and prepare the final construction plans and specifications for the road improvement project. The consultant shall visit the project site and become familiar with the project before submitting the proposal. The consultant shall field-verify the final project limits, right-of-way conditions, and existing improvement limits as part of the base mapping and preliminary design effort.
CountyND
Jul 22, 2026
Closes
Aug 14, 2026
Construction engineering services to ensure proper adherence to completed design and construction specifications such as surveying, sampling and testing of materials, inspection and measuring and computing pay quantities.
Special DistrictCA
Jul 24, 2026
Closes
Sep 14, 2026
Construction Management Services for the LBT1 Phase IV Electrification Project.