Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes remove existing bridge, perform site prep/restoration, provide 32' x 12' wide arched bridge w/20' approach both sides, set on galvanized sill pans; bridge requirements: 25,000# load, 42" horizontal railings, double decking.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
Posted Date
Dec 2, 2024
Due Date
Jan 8, 2026
Release: Dec 2, 2024
Close: Jan 8, 2026
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
AvailablePremium
Access the largest public sector contact database
Work includes repair and remediation of the hospital creek bridge.
Posted Date
Nov 24, 2025
Due Date
Jan 27, 2026
Release: Nov 24, 2025
Close: Jan 27, 2026
Work includes repair and remediation of the hospital creek bridge.
AvailableThe County of San Luis Obispo is soliciting bids to provide a permanent fix for the 2023 storm washout at Franklin Creek on Chimney Rock Road. The engineer’s estimate is $7,309,680 and bids are due December 18, 2025 at 3:00 PM PST.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
The County of San Luis Obispo is soliciting bids to provide a permanent fix for the 2023 storm washout at Franklin Creek on Chimney Rock Road. The engineer’s estimate is $7,309,680 and bids are due December 18, 2025 at 3:00 PM PST.
AvailableThe City of Gallatin is seeking to retain professional engineering consulting firms to design and prepare final construction plans for the South Westland Avenue (Bridge 833328 over CSX) replacement project, including preliminary engineering, environmental investigations, public involvement, surveying, right-of-way acquisition, utility/rail coordination, and preparation of bid documents. The project will replace the existing bridge with a new two-lane bridge with sidewalks, realign approaches, improve drainage, and relocate utilities.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
The City of Gallatin is seeking to retain professional engineering consulting firms to design and prepare final construction plans for the South Westland Avenue (Bridge 833328 over CSX) replacement project, including preliminary engineering, environmental investigations, public involvement, surveying, right-of-way acquisition, utility/rail coordination, and preparation of bid documents. The project will replace the existing bridge with a new two-lane bridge with sidewalks, realign approaches, improve drainage, and relocate utilities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis