Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes, but is not limited to construction of one additional chlorine contact basin (CCB) and rehabilitation of the existing CCB's, replacement of final clarifier's weirs and troughs, replacement of two sludge holding tanks to include mixing equipment, pumps, piping, valves, and accessories, construction of a new sludge transfer pump station, including pumps, pigging launchers, piping, valves, and accessories, modifications to large diameter gravity piping and junction boxes, construction of two new electrical buildings and a sludge screening building, and upgrades to the electrical power distribution and instrumentation control systems. See attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes new Dewatering and Drying Building to house sludge dewatering belt filter presses (BFPs), polymer dilution and feed systems, a sludge belt dryer and appurtenances, and supporting equipment; an odor control system to serve the Dewatering and Drying Building; a covered dried biosolids storage facility; modifications inside the Sludge Holding Tanks Control Building, including the removal of an existing plunger-type sludge pump and installation of a new progressing-cavity BFP feed pump with sludge grinder; improvements to the sludge holding tanks, including the installation of coarse bubble air diffusers in three holding tanks, a new outdoor blower facility, and air piping connecting the blowers to the diffusers; heating, ventilation and air conditioning for new facilities, as well as demolition and modifications to existing facilities; plumbing for new facilities; electrical for new facilities, and demolition and modifications to existing facilities; instrumentation and controls for new facilities and modifications to existing facilities; yard piping, grading, paving, and landscaping; installation, maintenance and removal of all erosion and sediment control, and other environmental protection measures, including all permits and approvals required; testing, start-up, training, and miscellaneous work; site cleanup and restoration.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Work includes new Dewatering and Drying Building to house sludge dewatering belt filter presses (BFPs), polymer dilution and feed systems, a sludge belt dryer and appurtenances, and supporting equipment; an odor control system to serve the Dewatering and Drying Building; a covered dried biosolids storage facility; modifications inside the Sludge Holding Tanks Control Building, including the removal of an existing plunger-type sludge pump and installation of a new progressing-cavity BFP feed pump with sludge grinder; improvements to the sludge holding tanks, including the installation of coarse bubble air diffusers in three holding tanks, a new outdoor blower facility, and air piping connecting the blowers to the diffusers; heating, ventilation and air conditioning for new facilities, as well as demolition and modifications to existing facilities; plumbing for new facilities; electrical for new facilities, and demolition and modifications to existing facilities; instrumentation and controls for new facilities and modifications to existing facilities; yard piping, grading, paving, and landscaping; installation, maintenance and removal of all erosion and sediment control, and other environmental protection measures, including all permits and approvals required; testing, start-up, training, and miscellaneous work; site cleanup and restoration.
AvailableCity of Atlanta issued Special Procurement SP-C 1220307 to procure replacement of the UV system at the Utoy Creek Water Reclamation Center. The solicitation was posted on Nov 17, 2025 with a response deadline of Feb 25, 2026 and an estimated value range of $500,000 - $2,000,000 as listed on the aggregator.
Posted Date
Nov 17, 2025
Due Date
Feb 25, 2026
Release: Nov 17, 2025
Close: Feb 25, 2026
City of Atlanta issued Special Procurement SP-C 1220307 to procure replacement of the UV system at the Utoy Creek Water Reclamation Center. The solicitation was posted on Nov 17, 2025 with a response deadline of Feb 25, 2026 and an estimated value range of $500,000 - $2,000,000 as listed on the aggregator.
AvailableFor bio-solids soil injection.
Posted Date
Nov 29, 2025
Due Date
Jan 13, 2026
Release: Nov 29, 2025
Close: Jan 13, 2026
For bio-solids soil injection.
AvailableWork includes Installation of approx. 15,500 LF of replacement 24", 30", 36", and 42" gravity sewer and associated replacement concrete and polymer concrete manholes. Installation of approx. 13,000 LF of CIPP structural liner in existing of 24", 30", 36" gravity sewer and epoxy lining of associated existing manholes. Abandonment of the existing 24" gravity sewer through lake dam. Installation of two pre-cast junction structures to maintain adequate flow splits in the creek sanitary sewer system. Installation of approx. 1,720 LF of stream stabilization measures. Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements. See attached file.
Posted Date
Dec 15, 2025
Due Date
Jan 29, 2026
Release: Dec 15, 2025
Close: Jan 29, 2026
Work includes Installation of approx. 15,500 LF of replacement 24", 30", 36", and 42" gravity sewer and associated replacement concrete and polymer concrete manholes. Installation of approx. 13,000 LF of CIPP structural liner in existing of 24", 30", 36" gravity sewer and epoxy lining of associated existing manholes. Abandonment of the existing 24" gravity sewer through lake dam. Installation of two pre-cast junction structures to maintain adequate flow splits in the creek sanitary sewer system. Installation of approx. 1,720 LF of stream stabilization measures. Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis