Summary
Work includes new Dewatering and Drying Building to house sludge dewatering belt filter presses (BFPs), polymer dilution and feed systems, a sludge belt dryer and appurtenances, and supporting equipment; an odor control system to serve the Dewatering and Drying Building; a covered dried biosolids storage facility; modifications inside the Sludge Holding Tanks Control Building, including the removal of an existing plunger-type sludge pump and installation of a new progressing-cavity BFP feed pump with sludge grinder; improvements to the sludge holding tanks, including the installation of coarse bubble air diffusers in three holding tanks, a new outdoor blower facility, and air piping connecting the blowers to the diffusers; heating, ventilation and air conditioning for new facilities, as well as demolition and modifications to existing facilities; plumbing for new facilities; electrical for new facilities, and demolition and modifications to existing facilities; instrumentation and controls for new facilities and modifications to existing facilities; yard piping, grading, paving, and landscaping; installation, maintenance and removal of all erosion and sediment control, and other environmental protection measures, including all permits and approvals required; testing, start-up, training, and miscellaneous work; site cleanup and restoration.