SKF 18TH AVENUE SEWER IMPROVEMENTS PROJECT
NOVEMBER 03, 2026 REQUEST FOR PROPOSAL SKF 18TH AVENUE SEWER IMPROVEMENTS PROJECT (Engineering Design & Engineering Construction Support Services) 1. INTRODUCTION The Selma-Kingsburg-Fowler County Sanitation District (Owner) is soliciting proposals from qualified engineering consulting firms to provide engineering design, bidding documents, and construction support services for the 18th Avenue Sewer Improvements Project (Project). The Project addresses approximately 5,080 linear feet (LF) of gravity sewer mains and associated manholes. S-K-F CSD MISSION STATEMENT x Operate and maintain the District facilities so that local, state and federal waste discharge requirements are complied with and the public health and environment are protected. x Provide adequate capacity to convey, treat and dispose of all wastewater so that the District can adequately serve the developing needs of its member cities and the surrounding area. x Operate and maintain District facilities so that annual costs are reduced to the lowest possible level that will safely sustain compliance with discharge requirements. 2. BACKGROUND The Selma-Kingsburg-Fowler County Sanitation District (District) is located in Fresno County. The District collects, treats and disposes wastewater originating from the residential, commercial, institutional and industrial dischargers from the three member cities and parts of unincorporated Fresno County. The District owns, operates and maintains the wastewater treatment plant. The sewer collection system is operated and maintained by the District. The District refurbishes and replaces each city's facilities. The member cities own the local sewer collection system, which includes sewers, lift stations, and appurtenances not owned by the District. The District serves an estimated population of 46,100. 3. SCOPE OF WORK The selected firm will be responsible for the preparation of plans, specifications and engineer's cost estimates for the refurbishment or replacement of approximately 5,080 linear feet of sewer main on 18th Avenue from Stroud Avenue to Kern Street in the City of Kingsburg (City), as shown in Appendix A of this document. Utilizing the District provided NASSCO PACP CCTV inspection logs, the successful proposer will deliver an alternatives analysis for recommended improvements, followed by bid ready design documents, bidding support, engineering construction support, and utility coordination for the Project. A. General Provisions: 1. Provide necessary services to complete the Project as identified herein. 2. Provide Project schedule of major milestones for completion. Provide regular updates of the project schedule and schedule meetings accordingly. 3. Provide monthly progress reports in PDF format to the District's Project Manager. 4. Manage project execution to ensure the Project is completed within the allotted time frame. 5. Coordinate design and Project activities with the District's Project Manager. 6. Manage the Project design to ensure estimated construction costs do not exceed the Project budget. 7. Manage engineering costs to ensure they do not exceed the authorized engineering services contract amount. 8. Prepare and distribute meeting agendas prior to all meetings and provide finalized meeting minutes within a timely manner. B. The scope of services includes, but is not limited to, the following: 1. Project Meetings: a. Schedule project kick-off meeting to establish protocols, confirm expectations, and coordinate data transfers. b. Schedule meeting at the 30% and 60% design submittal stages. c. Prepare for progress meetings to discuss design updates, conflicts and other issues or concerns as they arise. d. Progress meetings will be virtual or in-person, and as needed. e. Prepare meeting minutes. 2. Project Design (Sewer Main Refurbishment or Replacement) a. The Consultant will develop and maintain the baseline project schedule. b. The Consultant will inspect and become familiar with site conditions and constraints, perform topographic surveys and utility research as needed, identify required permits, if any, from regulatory agencies, and any other services required to complete the Project. c. The Consultant shall review and validate the NASSCO PACP CCTV Inspection logs (Appendix B). Immediately upon contract award, the District will grant the Consultant access to CCTV video files and photos for analysis. d. 30% Design. The consultant shall prepare a 30% submittal package including a conceptual plan with recommended construction methods (e.g., CIPP lining, remove and replace, repair) for each pipeline segment based on the data, a written analysis briefly summarizing the existing conditions, proposed improvements and justification for the recommendation for each segment, and a preliminary engineer's opinion of probable construction cost (estimate). e. 60% Design. Upon District approval of the 30% design, the Consultant shall prepare all necessary engineering drawings for construction. Plans must include, but are not limited to, all details, layouts, plan/profile, temporary bypass pumping, and other sheets as needed to complete the project. The Consultant shall prepare a project manual (Specifications) including front-end documents, special provisions, technical specifications, and appendices. The Consultant shall provide updated detailed estimate matching the plans to ensure alignment with the available project budget. The Consultant shall prepare a 60% submittal package including the plans, specifications and estimate (PS&E package) for review and approval. f. 90% Design. The Consultant shall revise the PS&E package as necessary and submit it to the District for final pre-bid review. The plans shall also be submitted to the City of Kingsburg for review and comment. The City comments shall be reviewed with the District and incorporated as directed by the District. g. 100% Design. Upon District acceptance of the 90% PS&E package, the Consultant shall submit final, stamped bid ready PS&E package to the District. h. Deliverables: 30%, 60% and 90% conceptual and PS&E packages in PDF format. Deliver the final 100% PS&E package. Final deliverable must include one full size (24"x36") hard copy alongside PDF copies. 3. Bidding Support a. Consultant will distribute electronic copies of the bid documents and maintain bid holders list. b. Prepare addenda as necessary during bid period to address bidder Requests for Information (RFIs). c. Attend prebid meeting and prepare meeting minutes. d. The District is responsible for advertisement of project for bidding. 4. Engineering During Construction Services a. The Consultant will attend preconstruction meeting and generate meeting minutes. b. Attend construction meetings on site to verify general conformance to construction contract documents. (up to 10 site visits). c. Review shop drawings and submittals. d. Review and respond to RFI's from the Contractor. e. Review pay requests, advise and assist with potential construction contract change orders or field directives, site visits, as needed by the District. f. Prepare record drawings and submit to District in Autocad and pdf format. This submittal must include the topographic survey and final construction in pdf and AutoCAD format. C. Project Duration 1. The Consultant shall complete all services under Section B.2 Project Design and deliver the final, stamped 100% bid ready PS&E package within six (6) months from the written Notice to Proceed. 2. Services under Section B.3 Bidding Support and Section B.4 Engineering During Construction Services are not bound by the six month design window. These services shall be provided dynamically to align with the District's public bidding schedule and the Construction schedule through final project acceptance. The Consultant shall provide all engineering, coordination, investigation, and support services reasonably necessary to deliver a complete, bid ready project and support the District through construction completion. 4. TRANSFER OF RECORDS It is the intent of the District that the work effort be conducted in a manner that maximizes the District's flexibility regarding follow-up studies or design-related efforts and other District projects. Software and software programs that would be necessary to achieve this shall be made available to the District at the end of this project. The use of proprietary software which cannot be made available to the District at the end of this project will not be allowed. All records (project reports, meeting notes, data files, project data, original tracings, maps, field sketches, flow data, design calculations, graphic originals, electronic files, etc.) generated shall be the property of the District and shall be turned over to the District upon completion or as directed. 5. TENTATIVE SCHEDULE-SUBJECT TO CHANGE Item End Date Proposals to District December 18, 2026 Select and notify firm December 23, 2026 Firm and District negotiate contract By: December 30, 2026 Staff request District Board action to authorize January Board meeting the General Manager to execute consulting services agreement. 6. PROPOSALS A. Due Date and Format for Submission. Proposals must be submitted to the District by 2:00 P.M., Friday, December 18, 2026. Faxed and emailed proposals will not be accepted. Proposals must be submitted in a sealed envelope clearly marked and labeled: SKF 18th Avenue Sewer Improvements Five (5) copies and (1) unbound original, signed by an officer who is authorized to execute legally binding agreements shall be mailed or delivered to: Selma-Kingsburg-Fowler County Sanitation District ATTN: Denise Isaguirre, Supervising Engineer Mailing Address: P.O. Box 158 Physical Address: 11301 E. Conejo Ave. Kingsburg, California 93631-0158 B. Cover Letter. A cover letter on Firm letterhead addressing the proposal should be submitted and be signed by an officer of the firm authorized to bind the Firm to all comments made in the proposal, and shall include the name, address, and phone number of the person(s) to contact who will be authorized to represent the Firm. C. Minimum Experience Qualifications Summary. Sufficient evidence as to the proponent's qualifications to perform the work is necessary. This may include former in-house experience and/or experience as a consultant. This information shall disclose and include pertinent facts and shall include at least a description of past performance on projects of similar type, scope, and size; project team members who worked on each project and their roles and percentage commitment of time on the project and any other pertinent information to demonstrate experience on similar assignments. In addition, please provide a statement regarding the proponent's ability to complete the work in a timely and professional manner. D. References. Provide a list of three references within last three years for completed sewer main replacement and refurbishment projects (CIPP, slip lining, full replacement etc.) including project completion date, duration, original project cost, project key members, role of firm, and final project cost. Include current contact person, email address, and phone number who may be contacted regarding firm performance. E. Experience, qualifications, and availability. Experience, qualifications, and availability of the proposed key project staff, including sub consultants, specifically related to the proposed function they would perform. Emphasis should be placed on projects by the individuals proposed where there was a team approach with a management group and project manager. F. Conflicts of Interest. A summary disclosing any potential conflicts of interest the firm may have from working with other clients or related issues. Note that this should not be construed as a conflict of interest in the strict legal sense, rather, any relationship with other parties that may have some interest in the performance of the Consulting Engineer. G. Cost Proposal. A cost proposal listing your standard professional hourly rates, a cost estimate for the scope of work outlined above, time for completion, and an estimate for reimbursable expenses (including method for charging). Please note the final scope of work and compensation will be negotiated with the selected proponent. H. Appendix. Appendix material may be provided but is not required. Appendix material should be limited to resumes of referenced key project personnel and previously published papers, articles, or reports relevant to the scope of work. 7. ACCEPTANCE OR REJECTION OF PROPOSALS A. Reservation of Rights. The District reserves the right to select the successful proposal and negotiate an agreement as to the scope of services, the schedule for performance and duration of the services with proponents whose proposals is/are most responsive to the needs of the District. Further, the District reserves the right to reject any and all proposals, or alternate proposals, or waive any informality or irregularity in the proposal as it is in the District's best interest. Additionally, the District may, for any reason, decide not to award a contract as a result of this RFP. Non-acceptance of any proposal shall not imply that the proposal was deficient. Rather, non-acceptance of any proposal will mean that another proposal was deemed to be more advantageous to the District or that the District decided not to award a contract as a result of this RFP. B. Proposal Development Costs. The cost of preparing and submitting a proposal is the sole responsibility of the proponent and shall not be chargeable in any manner to the District. 8. GENERAL TERMS AND CONDITIONS A. Licensing Requirements. Any professional certifications or licenses that may be required will be the sole cost and responsibility of the successful proponent. B. Insurance Requirements. Proponent, at proponent's sole cost and expense and for the full term of the resultant agreement or any extension, shall obtain and maintain at least all of the insurance required by the District for consultants. C. Agreement. The District will require execution of an agreement in substantial conformance with the attached Sample Agreement. 9. EVALUATION The information requested in the preceding section is intended to allow the selection committee to decide as to the suitability and qualifications of the proposing firm. Contingent on District Board approval, Consultant may be solicited for consulting services. The ability to provide such consulting services will be part of the evaluation process. The following criteria will be used in evaluating the written proposal: x Experience and qualifications of the proposed project manager - previous project management experience. (Weight: 10%) x Experience and qualifications of key project staff - previous experience and qualifications related to the proposed function they would perform. (Weight: 15%) x Performance on other sewer main projects, particularly quality of work; budget control; cooperation with Owner, project manager, and user groups; responsiveness. (Weight: 15%) x Production capabilities - adequacy of the facilities and sufficiency of technical and support staff. (Weight: 10%) x General impressions of firm's ability to successfully work with the District staff and complete the work; (Weight: 10%) x Clarity and organization of the submittal. (Weight: 10%) x Approach to work and project understanding. (Weight: 20%) x References. (Weight: 5%) x Costs. (Weight: 5%) 10. CONTACT INFORMATION. Any questions regarding this project should be directed in writing only to Denise Isaguirre, disaguirre@skfcsd.org. Cc: Jimmy Floyd, Richard Westerling, SKF Enclosures: Sample Form Consulting Services Agreement Appendix A: Project Location Map Appendix B: CCTV Inspection Logs