CityNJ
Aug 21, 2026
Closes
Sep 3, 2026
Phase I- Replacement of Water Main & Sewer Main Oak Street RFP
Project consists of but not limited to replacement of water main & sewer main.
Description: Work consists of removal of existing HID luminaires mounted to street light poles and mast arms, and installation of new LED luminaires including traffic control.
City · IL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityNJ
Aug 21, 2026
Closes
Sep 3, 2026
Project consists of but not limited to replacement of water main & sewer main.
CityCA
Aug 12, 2026
Closes
Sep 9, 2026
Convert existing metal halide fixtures for all ballfields to LED fixtures. Replacement of internal wire harness, replacing the metal halide fixtures with led fixtures on the existing crossarms, and replacing the ballast enclosures with driver enclosures. These shall be designed specifically by musco to meet the needs at each location to match lighting requirements based on existing light pole height and field use needs.
Special DistrictMA
Aug 5, 2026
Closes
Aug 26, 2026
Remove existing windows and trim and provide and install new windows and trim.
Jackson County Housing Authority
Special DistrictIL
Aug 18, 2026
Closes
Sep 22, 2026
Remove and replace existing shingle roofing and roof accessories (drip edge, pipe vent flashings, vent caps, shingle over ridge vents, etc.) on designated buildings.
Decision makers connected to this RFP from Village of Tinley Park.