Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of existing exterior LED display signs, including removal and disposal of old equipment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Monument sign display panel replacement.
Posted Date
Dec 16, 2025
Due Date
Jan 30, 2026
Release: Dec 16, 2025
Close: Jan 30, 2026
Monument sign display panel replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
4 EA Double sided (DS) LED sign display of 384x128 LED 2.54MM RGB software driver that is same as current authority driver which include bracket authority standard bracket from solari corp part #825F2451 *** alternate part is not acceptable. *** **please include manufacturer and part number in your quote comments. Freight charge must be included in the unit price.
Posted Date
Jan 20, 2026
Due Date
Jan 30, 2026
Release: Jan 20, 2026
Close: Jan 30, 2026
4 EA Double sided (DS) LED sign display of 384x128 LED 2.54MM RGB software driver that is same as current authority driver which include bracket authority standard bracket from solari corp part #825F2451 *** alternate part is not acceptable. *** **please include manufacturer and part number in your quote comments. Freight charge must be included in the unit price.
AvailableRelease: Jan 15, 2026
Close: Feb 4, 2026
Substation LED wall display.
AvailableWork consists of the modernization of (2) two of the (5) five passenger elevators and elevator machine rooms at the cajundome (elevators no. 3 and 5). The work will include the installation of new elevator hoist equipment/gripper racks and associated controller and driver units in the associated elevator machine rooms as well as the removal of asbestos-containing wall insulation and painting of the floors in the associated elevator machine rooms. The subject elevator cabs will receive new ceilings, lighting and control panels. Replacements will also include new elevator call equipment and elevator landing position indicators at each floor level. Related electrical work generally consists of disconnecting the existing equipment in the machine room's and hoistways of elevators 3 and 5, reworking and reconnecting the electrical as needed for connections to the new elevator equipment.
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
Close: Feb 11, 2026
Work consists of the modernization of (2) two of the (5) five passenger elevators and elevator machine rooms at the cajundome (elevators no. 3 and 5). The work will include the installation of new elevator hoist equipment/gripper racks and associated controller and driver units in the associated elevator machine rooms as well as the removal of asbestos-containing wall insulation and painting of the floors in the associated elevator machine rooms. The subject elevator cabs will receive new ceilings, lighting and control panels. Replacements will also include new elevator call equipment and elevator landing position indicators at each floor level. Related electrical work generally consists of disconnecting the existing equipment in the machine room's and hoistways of elevators 3 and 5, reworking and reconnecting the electrical as needed for connections to the new elevator equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →