Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across CAJUNDOME, Convention Center & Artisan Creative Catering 's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
CAJUNDOME, Convention Center & Artisan Creative Catering
Work consists of the modernization of (2) two of the (5) five passenger elevators and elevator machine rooms at the cajundome (elevators no. 3 and 5). The work will include the installation of new elevator hoist equipment/gripper racks and associated controller and driver units in the associated elevator machine rooms as well as the removal of asbestos-containing wall insulation and painting of the floors in the associated elevator machine rooms. The subject elevator cabs will receive new ceilings, lighting and control panels. Replacements will also include new elevator call equipment and elevator landing position indicators at each floor level. Related electrical work generally consists of disconnecting the existing equipment in the machine room's and hoistways of elevators 3 and 5, reworking and reconnecting the electrical as needed for connections to the new elevator equipment.
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
CAJUNDOME, Convention Center & Artisan Creative Catering
Close: Feb 11, 2026
Work consists of the modernization of (2) two of the (5) five passenger elevators and elevator machine rooms at the cajundome (elevators no. 3 and 5). The work will include the installation of new elevator hoist equipment/gripper racks and associated controller and driver units in the associated elevator machine rooms as well as the removal of asbestos-containing wall insulation and painting of the floors in the associated elevator machine rooms. The subject elevator cabs will receive new ceilings, lighting and control panels. Replacements will also include new elevator call equipment and elevator landing position indicators at each floor level. Related electrical work generally consists of disconnecting the existing equipment in the machine room's and hoistways of elevators 3 and 5, reworking and reconnecting the electrical as needed for connections to the new elevator equipment.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.