School DistrictNJ
Posted
Aug 24, 2026
Oct 8, 2026
Joyce Kilmer Elementary School and Horace Mann Elementary School 2027 Main Office Security Vestibule Renovations, AND A. Russell Knight Elementary Sc
Security vestibule addition and renovations.
Description: Lease of Space at Horace Mann Laboratory School for Early Education Program
City · MA, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
School DistrictNJ
Posted
Aug 24, 2026
Oct 8, 2026
Security vestibule addition and renovations.
Special DistrictPA
Posted
Sep 11, 2026
Oct 13, 2026
General Construction, Plumbing Construction and Electrical Construction Contracts. This project is a comprehensive renovation of the last remaining part related to the recreation area, covering the playground, splash pad and water features. Minor renovations to the athletic support building, with various site improvements such as fencing, walkways, concrete and asphalt pads, retaining walls and added lighting, and security features. The playground is expanded and resurfaced with poured-in-place rubber, bounded by a new perimeter curb and a new aluminum fence matching the existing, small areas these salvaged fences are reused. Site paving includes new concrete walkways, an asphalt replacement, and a new driveway seal at perimeter edge and a 20x34 pavilion building. The splash pad and water features are fully rebuilt: a new 6" custom-colored concrete splash pad, updated controls with watertight tie-ins, two new water features, and modified supply lines and junction boxes. The existing CMU support/building receives new door and openings reconfigurations to accommodate, a relocated overhead door, a gas-strut concession window, 2 new ADA restrooms restroom. New site amenities include a 34'×20' pavilion with integral lighting, an emergency generator, benches, tables, trash cans, and a shadow-box fence.
CityFL
Posted
Sep 2, 2026
Oct 6, 2026
The City of Palm Coast is seeking qualified firms or individuals for third-party landscape architect peer-review services. The selected provider will independently evaluate landscape and irrigation plans for compliance with Florida Building Codes, municipal ordinances, and environmental regulations. This is an open procurement solicitation rather than a grant program, with responses due by October 6, 2026, at 2:00 PM EDT.
Racine Unified School District
School DistrictWI
Posted
Sep 14, 2026
Oct 5, 2026
Racine Unified School District is soliciting construction management services for the Bull Early Education Center (BEEC) project. The selected contractor will oversee construction coordination, scheduling, cost estimating, and compliance with district specifications and timelines. A mandatory pre-bid meeting is scheduled for September 18, 2026, and proposals are due October 5, 2026, at 2:00 PM Central.
Decision makers connected to this RFP from City of Salem.