Contract 156 - Interceptor Sewer Rehabilitation Phase 5
Work generally includes the following: trenchless rehabilitation of existing sanitary sewer interceptors and manholes at two locations utilizing cured-in-place pipe lining (CIPPL). Provision, installation, and maintenance of temporary bypass pumps and piping to maintain sanitary sewer service of the upstream and affected properties and connections. Installation and maintenance of temporary bypass piping ramps as required when bypass piping crosses the municipal right of way and driveways. Provision and maintenance of temporary traffic control measures to ensure safe vehicular and pedestrian access around the project site. Additional items shown on the contract documents.