Closing soon

Contract 156 - Interceptor Sewer Rehabilitation Phase 5

Description: Work generally includes the following: trenchless rehabilitation of existing sanitary sewer interceptors and manholes at two locations utilizing cured-in-place pipe lining (CIPPL). Provision, installation, and maintenance of temporary bypass pumps and piping to maintain sanitary sewer service of the upstream and affected properties and connections. Installation and maintenance of temporary bypass piping ramps as required when bypass piping crosses the municipal right of way and driveways. Provision and maintenance of temporary traffic control measures to ensure safe vehicular and pedestrian access around the project site. Additional items shown on the contract documents.

Buyer
Bay Shore Regional Sewerage Authority

SpecialDistrict · NJ, US

Released
Jul 24, 2026
Closes
Sep 11, 2026(1 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts