Closed

Lancaster Area Sewer Authority - Charlestown Pump Station Switchgear Replacement, Project *REBID*

Description: demolition; bypass pumping; electrical service and distribution and switchgear replacement and associated earthwork, utilities, and cast-in-place concrete; electro-magnetic flowmeter and associated pipe, fittings, and painting; and all other work. The work includes all requirements to provide a fully finished and operable switchgear and electro-magnetic flowmeter for a fully functional pump station as indicated, shown, specified or required to complete the work in strict conformity with the Contract Documents. The work also includes all specified, indicated and shown electrical equipment, appliances, appurtenances, furnishings, electro-magnetic flowmeter, instrumentation and controls, accessories, tests and sundry parts and material as shall be necessary and required for a completely operable installation satisfactory to the Engineer.

Buyer
Lancaster Area Sewer Authority

SpecialDistrict · PA, US

Released
Apr 28, 2026
Closes
Sep 10, 2026(Closed)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts