CityMN
Posted
Nov 9, 2026
Nov 30, 2026
Roseville, City of Brenner Lift Station Rehabilitation Project 26X.144977 RFP
Work includes approx. of lift station rehabilitation.
Description: DESCRIPTION OF WORK: The work includes the construction of approximately: 1. Replacement of existing centrifugal pumps, process piping and valves, electrical equipment and VFDs. 2. Installation of makeup air unit and miscellaneous HVAC and plumbing improvements. 3. Building structural modifications. 4. Installation of a bypass manhole and exterior piping modifications. together with numerous related items of work, all in accordance with Plans and Specifications.
City · MN, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CityMN
Posted
Nov 9, 2026
Nov 30, 2026
Work includes approx. of lift station rehabilitation.
CityMN
Posted
-
Nov 24, 2026
The project encompasses the complete construction of a cast-in-place lift station fully equipped with pumps, piping, valves, controls, and benching, alongside the installation of associated manholes featuring piping, benching, and flow meters. Essential site infrastructure will be established through the construction of a control building with control panels, HVAC, electrical, and plumbing systems, accompanied by the installation of a generator, safety fencing, a bioxide tank, and a bituminous driveway with a dedicated parking lot. Additionally, on-site utility network development requires the installation of watermain, sanitary sewer, forcemain, and storm sewer lines, all executed in close coordination with the developer regarding site grading, airport road construction, and final utility connections.
CityMN
Posted
Nov 6, 2026
Dec 2, 2026
112 TN - aggregate base; 1800 SF - concrete walk; 580 SF - 3" bituminous walk; 365 LF - concrete curb & gutter; 200 sf - truncated domes; 580 SF - pavement markings.
CityOR
Posted
Nov 4, 2026
Dec 1, 2026
Work includes approx 4,714 SF of road widening areas; 270 SF of reconstruction areas; 1,115 SY of cold-plane pavement removal; 7,930 LF of stiping; 50 LF of AC pavement removal & repairs.