Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Knightdale
This project will construct two crosswalks across Boulevard. The first crosswalk will be the western leg of Boulevard at Drive and will include pavement markings, signals, sidewalk, drainage improvements, minor roadway improvements, and curb and gutter. The second crosswalk will be the northern and eastern legs of Boulevard at Old Knight Road/N. First Avenue and will include pavement markings, signals, sidewalk, and drainage improvements. This project is a partnership between the Town and the Wake County Transit Tax District Community Funding Program. This project will not receive federal funding and will be bid to the Town of standards. 90 LF Directional Drill 1 Conduit, 2” NCDOT 1715.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Marco Island
Work includes construction of two new pedestrian crosswalk improvements, furnishing and installing a rectangular rapid flashing beacon (RRFB), removal and replacement of concrete sidewalks with detectable warnings, removal of an existing culvert pipe, and furnishing and installing a new culvert pipe with mitered end sections, furnishing and installing two streetlights,furnishing and installing signs, and placement of thermoplastic pavement markings.
Posted Date
Oct 26, 2025
Due Date
Dec 3, 2025
Release: Oct 26, 2025
City of Marco Island
Close: Dec 3, 2025
Work includes construction of two new pedestrian crosswalk improvements, furnishing and installing a rectangular rapid flashing beacon (RRFB), removal and replacement of concrete sidewalks with detectable warnings, removal of an existing culvert pipe, and furnishing and installing a new culvert pipe with mitered end sections, furnishing and installing two streetlights,furnishing and installing signs, and placement of thermoplastic pavement markings.
AvailableFayette County
Bluegrass boulevard phase III- roadway improvements.
Posted Date
Nov 1, 2025
Due Date
Nov 24, 2025
Release: Nov 1, 2025
Fayette County
Close: Nov 24, 2025
Bluegrass boulevard phase III- roadway improvements.
AvailableCity of Wildwood
The City of Wildwood seeks bids to repair and upgrade Rectangular Rapid Flashing Beacons at three pedestrian crosswalks along Manchester Road, including supplying solar engines, LED bars, MUTCD signs, and pedestrian push buttons. Work also involves wiring, mounting hardware, and pole replacement in compliance with MUTCD and city standards.
Posted Date
Nov 17, 2025
Due Date
Dec 2, 2025
Release: Nov 17, 2025
City of Wildwood
Close: Dec 2, 2025
The City of Wildwood seeks bids to repair and upgrade Rectangular Rapid Flashing Beacons at three pedestrian crosswalks along Manchester Road, including supplying solar engines, LED bars, MUTCD signs, and pedestrian push buttons. Work also involves wiring, mounting hardware, and pole replacement in compliance with MUTCD and city standards.
AvailableCity of Long Beach
Work includes traffic control: pedestrian and vehicular traffic control; Demolition and Removal: demolition and removal of existing pedestrian concrete paving and brick pavers, curb ramp, portion of existing driveway, apron and curb, concrete curbs at planting areas, and landscape elements; Surface and Structural Improvements: Improvements to be constructed include new Americans with Disabilities (ADA) curb ramp, portion of vehicular driveways, aprons, and curbs, enhanced integral color concrete paving, decorative embedded metal inlays with antislip coating (bid alternate), pedestrian concrete paving, raised truncated domes at signalized vehicular crossings, disintegrated granite (D.G.) at existing tree wells, decorative epoxy modified acrylic coating on existing crosswalk concrete paving; Site Furnishing and Architectural Elements: site furnishings, irrigation, landscape planting, refinishing select existing vehicular light poles and mast poles with new paint and existing bench seating (bid alternate), and all associated site development. Preservation of Exiting Features: Some elements on site, including but not limited to, concrete paving, pedestrian lighting, palm trees/trees, utilities, and other associated items shall be protected in place.
Posted Date
Oct 30, 2025
Due Date
Dec 18, 2025
Release: Oct 30, 2025
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Long Beach
Close: Dec 18, 2025
Work includes traffic control: pedestrian and vehicular traffic control; Demolition and Removal: demolition and removal of existing pedestrian concrete paving and brick pavers, curb ramp, portion of existing driveway, apron and curb, concrete curbs at planting areas, and landscape elements; Surface and Structural Improvements: Improvements to be constructed include new Americans with Disabilities (ADA) curb ramp, portion of vehicular driveways, aprons, and curbs, enhanced integral color concrete paving, decorative embedded metal inlays with antislip coating (bid alternate), pedestrian concrete paving, raised truncated domes at signalized vehicular crossings, disintegrated granite (D.G.) at existing tree wells, decorative epoxy modified acrylic coating on existing crosswalk concrete paving; Site Furnishing and Architectural Elements: site furnishings, irrigation, landscape planting, refinishing select existing vehicular light poles and mast poles with new paint and existing bench seating (bid alternate), and all associated site development. Preservation of Exiting Features: Some elements on site, including but not limited to, concrete paving, pedestrian lighting, palm trees/trees, utilities, and other associated items shall be protected in place.
Available