Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Massachusetts College of Liberal Arts (MCLA) invites sealed bids for the Kleefeld/CSI Fiber Optic & Fire Alarm Infrastructure Upgrades in North Adams, MA to modify campus fiber optic and fire alarm systems per documents prepared by Hesnor Engineering Associates. The solicitation is an open-market, construction-type procurement with an estimated agency cost of approximately $83,548 and a period of performance completing by January 28, 2026. A pre-bid/site visit is scheduled for January 20, 2026 at 9:00 AM at 341 Ashland Street, North Adams; bids are due January 28, 2026 at 2:00 PM (per the COMMBUYS detail page).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes upgrading the existing fire alarm system, wiring, devices, etc.
Posted Date
Jan 5, 2026
Due Date
Jan 30, 2026
Release: Jan 5, 2026
Close: Jan 30, 2026
Work includes upgrading the existing fire alarm system, wiring, devices, etc.
AvailableFurnish, install, and test outside plant fiber optic infrastructure for its broadband infrastructure deployment.
Posted Date
Jan 13, 2026
Due Date
Feb 20, 2026
Release: Jan 13, 2026
Close: Feb 20, 2026
Furnish, install, and test outside plant fiber optic infrastructure for its broadband infrastructure deployment.
AvailableWork includes fire alarm upgrades.
Posted Date
Dec 3, 2025
Due Date
Jan 28, 2026
Release: Dec 3, 2025
Close: Jan 28, 2026
Work includes fire alarm upgrades.
AvailableThis project includes, but is not limited to, the replacement of the existing fire alarm system with a complete new fire alarm system including strobes, speakers, speaker/strobes, smoke detectors, heat detectors, conductors, control panel, annunciator, and pull stations; minor trenching between buildings; and patching and painting.
Posted Date
-
Due Date
Feb 26, 2026
Release: -
Close: Feb 26, 2026
This project includes, but is not limited to, the replacement of the existing fire alarm system with a complete new fire alarm system including strobes, speakers, speaker/strobes, smoke detectors, heat detectors, conductors, control panel, annunciator, and pull stations; minor trenching between buildings; and patching and painting.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis