Higher EducationUT
Posted
-
Oct 21, 2026
Stadium Signs Replacement RFP
Work consists of Stadium Signs Replacement project.
Description: Project consists of replacement of LED components at Stadium.
HigherEducation · IA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Higher EducationUT
Posted
-
Oct 21, 2026
Work consists of Stadium Signs Replacement project.
Posted
Sep 28, 2026
Oct 28, 2026
The custom 60-Ton 4-Cylinder Hydraulic Recuperator Press modification or replacement shall include full replacement of obsolete parts, 4 load cells in series of the cylinders with a summation function that is displayed on a control panel that will allow operators to set a desired load and implement that load using a sequential ramp output. The monitor shall display the target load, observed load, and distance in inches from the top fixture to a bottom fixture. The press is coupled with a separated pneumatic system that introduces a set pounds per square inch gauge (psig) air within the part with a differential gauge to observe pressure differential from the part and a pressurize tank. The monitor shall be able to display a target pneumatic pressure in psi, with an observe differential display to be in inches of water. This system shall incorporate a closed loop control with the ability for the operator to set alarm upper and lower limits for the summated load, upper and lower limits for the distance, and upper limits for the differential pressure. The control shall have sufficient memory to store a minimum of 2,500 test reports with time stamps and identification numbers with search features to recall archived tests.
Evansville-Vanderburgh School Corporation
School DistrictIN
Posted
Oct 9, 2026
Nov 4, 2026
Stadium LED lighting upgrade.
CountyWA
Posted
Oct 7, 2026
Nov 4, 2026
This project provides for the Electrical lighting controls replacement to include: replacing the existing lighting control panels with a new control system including new central lighting control station, provide wiring for integration of control system into local network across the six buildings at Central Maintenance Facility.
Decision makers connected to this RFP from The University Of Iowa.