CityCA
Posted
Sep 22, 2026
Oct 20, 2026
Rockledge Drive Storm Drain Improvements
Work consists of constructing a new storm drain system, beginning with the removal and reconstruction of the existing catch basin, while retaining the existing inverts of the existing laterals. will also include the construction of an additional catch basin and 12" reinforced concrete pipe (RCP) connecting to the main line via a proposed junction structure.
