CityTX
Aug 6, 2026
Closes
Aug 26, 2026
Joy Drive Wastewater Improvements
Work consist of 417 lf of trench safety implementation, 325 lf of 8" c900 pvc (green) (dr-25) (all depths) including excavation & all backfill (off-street trench), 75 lf of 8" c900 pvc (green) (dr-25) (all depths) including excavation & all backfill (street trench), 3 ea of 4' dia concrete manhole (all depths) w/ composite cover & frame, 1 ea of 5-foot diameter concrete manhole (all depths) w/ composite cover & frame, 3 ea of connect proposed 8" wastewater to ex. Wastewater manhole, 417 lf of bermuda seeding, 417 lf of video new wastewater line, 60 lf of remove existing fence and replace with new fence. See attached file.