Bollman Water Treatment Plant Improvements RFP
Water treatment plant improvements.
Description: Project consists of upgrades to the existing security system, including the video camera system, door locks, ID-card readers, radar detection system, software and servers, and lighting; installation of fiber optic cable; electrical modifications; restoration of disturbed areas; and other appurtenant work.
SpecialDistrict · CA, US
Adjacent opportunities open for bidding right now.
Special DistrictCA
Posted
Oct 29, 2026
Dec 10, 2026
Water treatment plant improvements.
CityOK
Posted
Oct 14, 2026
Nov 18, 2026
Scope consists of 1 LS chemical system improvements; 9 EA 36" motorized actuator; 3 EA 60" motorized actuator; 4 EA 36" butterfly valve, mj.
CityMO
Posted
Oct 30, 2026
Dec 8, 2026
Construction of water main replacement and water treatment plant improvements.
CityOK
Posted
Oct 15, 2026
Nov 16, 2026
2 Ea treatment unit; 1 LS PEMB structure and foundation; 1 Ea clearwell; 1 LS decanter system; 2 Ea backwash/residual holding tank; 1 LS waste lift station; 1 LS influent submersible pumps and piping with valve vault; 1 LS package grinder pump station; 1 LS mixing vault; 1 LS bleach injection vault; 1 LS effluent injection vault; 1 LS sampling vault; 1 Ea generator with concrete pad; 1 LS ATS and electrical improvements; 190 LF of 8" water main, PVC C900 DR18; 180 LF of 6" water main, PVC C900 DR18; 75 LF of 12" sewer main, PVC C900 SDR26; 104 LF of 8" sewer main, PVC C900 SDR26; 4 LF of 4" sewer main, PVC C900 SDR26; 55 LF of 4" force main, PE SDR 11; 1,082 LF of 2" force main, PE SDR 11; 1 Ea standard manhole, 5-10 LF deep; 2,010 SY of 6" thick gravel surface; 620 LF of 6' chain link fencing w/climb barrier; 1 Ea of 24' wide dbl leaf gate; 500 CY embankment; 35 CY unclassified excavation; 1 LS hydrostatic pressure test and disinfection; 1 LS mobilization; 1 LS erosion control.
Decision makers connected to this RFP from Metropolitan Water Dist Of Southern California.
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
380 days before RFP
The quarterly report records continued final design of Jensen Plant Site Security Upgrades and plans completion of final design in the next quarter.
• Continued final design of the following projects: o Diemer Filter Rehabilitation o Jensen Plant Site Security Upgrades o Weymouth Administration Building Upgrades • Executed a Board-authorized agreement amendment for final design of the following projects: o Jensen Finished Water Reservoir Rehabilitation o Mills Finished Water Reservoir Rehabilitation •…
Engineering, Operations, and Technology Committee Meeting
Agenda packet · Sep 8, 2025
Agenda packet
345 days before RFP
Metropolitan's committee presentation listed Jensen Security Upgrades among critical projects ready for award during the current biennium.
Contracts $10 to $40 Million Contracts over $70 Million • CRA Pumping Plants Sump Rehabilitation • Eagle & Hinds Pumping Plants Utilities Replacement • Jensen Security Upgrades • Weymouth Admin. Bldg. Seismic Upgrade • Cabazon Radial Gate Facility Rehabilitation • Lakeview Pipeline Stage 2A Relining • San Diego Canal Radial Gates Rehabilitation • Sepulveda…
Engineering, Operations, and Technology Committee Meeting
Agenda packet · Oct 13, 2025
Agenda packet
183 days before RFP
Metropolitan's workshop presentation included Jensen Security among projects proposed for award under an $800 million FY 2026/28 budget alternative.
FY 2026/28 Biennium Budget Set at $800 M -- Alternative #2 • Defer award of drought projects • Sepulveda Pump Stations (Sepulveda site) • Foothill Pump Station -- Inland Feeder Intertie • Award several rehabilitation projects • Weymouth Admin. & Control Bldg. Seismic\* • Hollywood Tunnel North Portal Improvements\* • Jensen Security • CRA Copper Basin…
Board Of Directors Workshop On Finance, Affordability, Asset Management And Efficiency Workshop
Agenda packet · Mar 24, 2026
Agenda packet
162 days before RFP
Metropolitan's CIP attachment proposed the Jensen Site Security Upgrade, reporting completed final design and planning construction to begin in 2029.
• Major milestones achieved or forecasted to be achieved: ◦ Jensen Administration Building Column Panel Replacement -- construction completed ◦ Jensen Control Room HVAC System Upgrades -- construction to be completed ◦ Jensen Ozone Critical Components Upgrade -- Stage 1 -- construction completed ◦ Jensen Site Security Upgrade -- final design completed ◦…
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (4 days left)
Engineering, Operations, And Technology Committee Meeting
Agenda packet · Apr 14, 2026
Jensen Site Security Upgrade This project will implement needed upgrades to the existing Jensen plant site security system, which is undersized and aged. Planed upgrades include installation of additional card readers and motion-activated lights in sensitive areas; replacement of existing aging security cameras with high resolution cameras; addition of new…
Engineering, Operations, And Technology Committee Meeting
Agenda packet · Apr 13, 2026
Jensen Site Security Upgrade This project will implement needed upgrades to the existing Jensen plant site security system, which is undersized and aged. Planed upgrades include installation of additional card readers and motion-activated lights in sensitive areas; replacement of existing aging security cameras with high resolution cameras; addition of new…
Metropolitan Water District of Southern California Capital Investment Plan 2026-2028
Capital improvement plan · 2026