University Of Nevada Las Vegas
Higher EducationNV
Posted
Sep 8, 2026
Oct 9, 2026
Carol C. Harter Classroom Building Complex – Building B (CHB-B) Hydronic Heating Piping Replacement
Replace the existing hydronic heating piping system. Install UNLV-furnished Type L hard-drawn copper piping for piping sizes up to and including 2-1/2". Install UNLV-furnished Schedule 40 black steel piping for piping sizes larger than 2-1/2". Provide and install all fittings, couplings, flanges, welding materials, brazing materials, press fittings, transition fittings, joint material.
