CityIL
Posted
Oct 14, 2026
Oct 30, 2026
2027 & 2028 On-Call Lead Water Service Line Replacement RFP
Work includes exploratory excavation, 8', remove and plug abandoned water service, water main repair clamp with 1" tap, connect to existing service tap, connect to existing curb stop and box, trenchless copper water service, 1", interior 1" copper pipe (length above included 10'), interior connection to water meter w/slab, residential, sanitary sewer removal and replacement, 6", temporary pavement, 2", barricades, type 2 w/steady burn lights, class d patching, n50, 3" to 5", pcc sidewalk removal & replacement, 5". See outside link.
