North and South Jefferson Street Water Main Replacement
Posted
Sep 2, 2026
Sep 24, 2026
Work consists of 926 SF, walk removed; 100FT, 4" conduit, type b, 707.45; 100 FT, 6" conduit, type b, 707.45; 100 FT; 100 FT, 8" conduit, type b, 707.45; 100 FT, 1250 ST, seeding and mulching, class 1; 52 EA, meter pit, including setting and valves; 50 FT, 4" conduit, type b, 707.45 sanitary repair; 6" conduit, type b, 707.45. Sanitary repair; 2539 FT, 6" AWWA C900 DR-18 water main; 777 FT, 8" AWWA C900 DR-18 water main; 9 EA, 6" gate valve; 3 EA, 8" gate valve; 926 SF, 4" concrete walk.
