Replacement of lead and galvanized water service lines throughout the city.
Description: Work includes exploratory excavation, 8', remove and plug abandoned water service, water main repair clamp with 1" tap, connect to existing service tap, connect to existing curb stop and box, trenchless copper water service, 1", interior 1" copper pipe (length above included 10'), interior connection to water meter w/slab, residential, sanitary sewer removal and replacement, 6", temporary pavement, 2", barricades, type 2 w/steady burn lights, class d patching, n50, 3" to 5", pcc sidewalk removal & replacement, 5". See outside link.
City · IL, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CityMN
Posted
Oct 12, 2026
Oct 29, 2026
Replacement of lead and galvanized water service lines throughout the city.
CityNY
Posted
Oct 9, 2026
Nov 4, 2026
Requesting proposals from qualified engineering firms for the preparation of a Lead Service Line Inventory (LSLI) and Lead Service Line Replacement Plan (LSLRP).
Boulder Farmstead Water Corporation
Special DistrictUT
Posted
Sep 30, 2026
Oct 27, 2026
Work under schedule includes potholing existing service line customer and system side of meter using hydrovac potholing methods. Work under schedule ii includes replacing lead, copper, or galvanized service line with approx 1460 LF of ips service line, 5 CY of landscape repair, 3 SY of concrete flatwork, and related work. Bids will be received for single contract.
CityMN
Posted
Oct 9, 2026
Nov 4, 2026
Project generally consists of removals, excavation, water service replacement, plumbing, electrical, bituminous pavement, concrete walk, concrete pavement.