Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide maintenance and repair services for maintenance, repair, and/or replacement of lift and pump stations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide annual preventative maintenance for 10 lift stations located within the city limits. This will include 23 pumps of different sizes ranging from 5 horsepower to 35 horsepower and all rated at 3 phase power.
Posted Date
Dec 18, 2025
Due Date
Jan 30, 2026
Release: Dec 18, 2025
Close: Jan 30, 2026
Provide annual preventative maintenance for 10 lift stations located within the city limits. This will include 23 pumps of different sizes ranging from 5 horsepower to 35 horsepower and all rated at 3 phase power.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of construction of the lift stations 4 & 5 reconstruction. Full replacement of the wet well and valve vault of two lift stations with associated gravity sewer and forcemain improvements, new combination pump control/scada panel, an air release valve replacement, associated pavement replacement and site improvements.
Posted Date
Dec 18, 2025
Due Date
Jan 22, 2026
Release: Dec 18, 2025
Close: Jan 22, 2026
Project consists of construction of the lift stations 4 & 5 reconstruction. Full replacement of the wet well and valve vault of two lift stations with associated gravity sewer and forcemain improvements, new combination pump control/scada panel, an air release valve replacement, associated pavement replacement and site improvements.
AvailableThe contractor will clean, disassemble and repair the broken components of 2 (two) sewer lift station pumps.
Posted Date
Jun 3, 2025
Due Date
Jun 6, 2029
Release: Jun 3, 2025
Close: Jun 6, 2029
The contractor will clean, disassemble and repair the broken components of 2 (two) sewer lift station pumps.
AvailableSeeking on-call, on-demand and emergency services for pump maintenance and repair services as needed for pumps and motors for all city owned facilities.
Posted Date
Dec 1, 2025
Due Date
Jan 12, 2026
Release: Dec 1, 2025
Close: Jan 12, 2026
Seeking on-call, on-demand and emergency services for pump maintenance and repair services as needed for pumps and motors for all city owned facilities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →