Upgrades to the Pearl Street Pump Station facilities and associated infrastructure, including but not limited to the following: The Work at the Headworks Building (1 Pearl Street) includes but is not limited to demolition of the existing pump station superstructure, selective demolition within the existing structure, reuse and rehabilitation of the existing foundation, construction of a new Headworks Building superstructure, furnishing and installing mechanical screening equipment, furnishing and installing a manual bypass screen, furnishing and installing two aerated grit channels, modification of a garage area for grit and screenings handling and disposal, furnishing and installing new electrical equipment, and all materials, equipment, services, and construction inherent to the
Work; The Work at the Pump Station Building (6 Pearl Street) includes but is not limited to construction of a new Pump Station Building and foundation, furnishing and installing a vortex grit removal
system, furnishing and installing three dry‑pit submersible sewage pumps, furnishing and installing new electrical equipment, installing an emergency standby generator, furnishing and installing an odor control system, and all materials, equipment, services, and construction inherent to the Work; The Work for Site Improvements includes but is not limited to site work, yard piping, furnishing
and installing gravity sewers between the Headworks Building and Pump Station Building, furnishing and installing electrical duct banks, landscaping, paving, site lighting, site restoration and all associated infrastructure located outside of the buildings; The Work for the Force Main includes but is not limited to furnishing and installing approx. 3,000 LF of new dual 20” diameter force mains from the Pump Station Building, across Fore River, and to the wastewater treatment facility at Waterman Drive, including all materials,
equipment, services, and construction inherent to the Work.
Available