CityTX
Posted
Oct 25, 2026
Nov 19, 2026
Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation RFP
Seeking qualified vendors for wastewater treatment plant phase 2 - collection system rehabilitation.
Description: Augusta Water is soliciting bids for furnishing sewer system rehabilitation by trenchless CIPP liner and cementitious manhole lining or other approved method.
SpecialDistrict · VA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityTX
Posted
Oct 25, 2026
Nov 19, 2026
Seeking qualified vendors for wastewater treatment plant phase 2 - collection system rehabilitation.
Olivenhain Municipal Water District
Special DistrictCA
Posted
Oct 19, 2026
Nov 18, 2026
Collection system manhole rehabilitation project. Scope of work includes - 1 LS Manhole 03-0034 5' Diameter manhole 5' x 12' manhole with existing T-lock; 1 LS Remove T-lock, hydroblast inside of manhole, repair any deteriorated substrate with high-strength, non-shrink repair mortar, remove existing PVC liner ensuring the embedded Ts of the liner are completely removed from the substrate, apply a 1-3 Mil epoxy primer to all concrete to be lined, topcoat with 125 Mils thickness polyurethane liner (lining will extend from directly beneath the manhole frame to the spring line in the channel), and spark test at 15,000 volts. No traffic control. See outside link.
South Tahoe Public Utilities District
Special DistrictCA
Posted
Oct 27, 2026
Dec 11, 2026
The South Tahoe Public Utility District (District) is seeking proposals from qualified consulting firms to develop Water System and Sewer Collection System Strategic Plans. The work will be completed under a single contract and will result in two coordinated stand-alone plans: a Water System Strategic Plan and a Sewer Collection System Strategic Plan. The effort will also include a combined Executive Summary and District-wide infrastructure investment roadmap that brings together the major findings, priorities, and recommended investments from both plans. The Water System Strategic Plan will address the District’s potable water system, while the Sewer Collection System Strategic Plan will focus on the collection system. Figures depicting the Water and Sewer Collection Systems are provided in Attachment A. The District intends for these Strategic Plans to go beyond conventional capacity-based utility master planning. The plans will integrate traditional system planning and modeling with asset management, Level of Service (LoS), condition and performance information, probabilistic risk, lifecycle strategies, and long-range planning to establish a defensible 30- to 50-year infrastructure investment framework. The selected Consultant will be expected to build upon the District’s existing planning, models, GIS, and Enterprise Asset Management (EAM) system, and other available information. The resulting framework and tools should be practical for District staff to maintain and use for annual CIP updates and future Strategic Plan reassessments.
CityTN
Posted
Oct 22, 2026
Nov 5, 2026
Water Distribution Items
Decision makers connected to this RFP from Augusta Water.