Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
South Tahoe Public Utilities District
Work consists of drilling and installing production wells including site preparation, installation of temporary perimeter sound walls, reverse rotary drilling, lithologic sampling, geophysical logging, installation of casing and screen, installation of gravel pack and intermediate seals, installation of sanitary seal, well development, pump testing, and installation of surface completion.
Posted Date
May 7, 2026
Due Date
Jun 8, 2026
Release: May 7, 2026
South Tahoe Public Utilities District
Close: Jun 8, 2026
Work consists of drilling and installing production wells including site preparation, installation of temporary perimeter sound walls, reverse rotary drilling, lithologic sampling, geophysical logging, installation of casing and screen, installation of gravel pack and intermediate seals, installation of sanitary seal, well development, pump testing, and installation of surface completion.
South Tahoe Public Utilities District
The South Tahoe Public Utility District (STPUD) is soliciting bids for the construction of the 2026 Pioneer Trail Waterline Project (Rebid), which includes installation of approximately 8,700 LF of 16-inch ductile iron waterline and three pressure reducing valve stations. The project is funded in part by EPA Community Grants, USDA Forest Service funds, and a California DWSRF loan, requiring compliance with federal and state prevailing wage and DBE requirements. Bids are due June 9, 2026, and the project involves significant paving, traffic control, and stormwater compliance measures.
Posted Date
May 8, 2026
Due Date
Jun 9, 2026
Release: May 8, 2026
South Tahoe Public Utilities District
Close: Jun 9, 2026
The South Tahoe Public Utility District (STPUD) is soliciting bids for the construction of the 2026 Pioneer Trail Waterline Project (Rebid), which includes installation of approximately 8,700 LF of 16-inch ductile iron waterline and three pressure reducing valve stations. The project is funded in part by EPA Community Grants, USDA Forest Service funds, and a California DWSRF loan, requiring compliance with federal and state prevailing wage and DBE requirements. Bids are due June 9, 2026, and the project involves significant paving, traffic control, and stormwater compliance measures.
South Tahoe Public Utilities District
Indian creek reservoir nutrient control planning and technical services. Consultant awarded this contract will be responsible for: technical review of existing conditions, background materials, and regulatory requirements; real-time monitoring buoy provision, installation, and maintenance; chemical treatment planning for ACH application; water quality monitoring program design for implementation by district staff; environmental compliance and permitting support; reporting, public communication support, and related technical documentation. See outside link.
Posted Date
Apr 30, 2026
Due Date
May 29, 2026
Release: Apr 30, 2026
South Tahoe Public Utilities District
Close: May 29, 2026
Indian creek reservoir nutrient control planning and technical services. Consultant awarded this contract will be responsible for: technical review of existing conditions, background materials, and regulatory requirements; real-time monitoring buoy provision, installation, and maintenance; chemical treatment planning for ACH application; water quality monitoring program design for implementation by district staff; environmental compliance and permitting support; reporting, public communication support, and related technical documentation. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from South Tahoe Public Utilities District
The meeting agenda includes discussions on various water supply projects, such as well drilling, real estate agreements, and geologic support services. The committee will address the Pioneer Trail waterline project, including construction contracts and survey agreements. Additionally, the agenda covers task order amendments and approvals for sewer pump station rehabilitation and replacement designs. Operations reports are scheduled for the water system, sewer collection system, wastewater treatment plant, and recycled water facilities, along with updates on the Advanced Clean Fleets Regulation.
The Board meeting included discussions and actions on several key items. Key agenda items included the approval of water and sewer service charge rate increases for the upcoming fiscal year, the adoption of the Water and Sewer Enterprise Fund Budgets, the extension of a polymer supplies contract, and the receipt and filing of fiscal year-to-date financial statements. Additionally, the Board considered the annual adoption of the Statement of Investment Policy and held a closed session regarding existing litigation.
The board discussed the purchase of the Gravity platform for various financial management solutions, including budgeting, annual financial reporting, and grant management. Additionally, the agenda included a proposal for a change order regarding the 2024 Tanks Coating Touchups Project, which involved adjusting the scope and costs for specific water storage tanks, and a review of the payment of claims for the district.
The Board addressed multiple agenda items including a public hearing for delinquent sewer and water accounts, the adoption of an ordinance amending the low-income customer assistance program, and the approval of a reimbursement agreement with the City of South Lake Tahoe for a road project. Additionally, the Board discussed the standardization of access gates at the treatment plant, committee assignments, and emergency responses to winter storms. Financial items included the adoption of a pay listing by position, approval of a change order for a motor rebuild at the Luther Pass Pump Station, and the review and filing of payment of claims.
The board meeting focused on various operational, financial, and capital project items. Key discussions included a legislative update, the approval of a scope of work for the Water Supply Master Plan, the award of the Paloma Well and Keller Booster Station Backup Power Project, and the termination of an emergency action related to winter storms. Additionally, the board addressed the rollover of capital outlay funds for the current fiscal year, received and filed preliminary financial statements for the fiscal year ending June 30, 2024, and reviewed a proposal for engineering services for the 2025 Keys Cast-in-Place Sewer Rehabilitation project.
Extracted from official board minutes, strategic plans, and video transcripts.
Track South Tahoe Public Utilities District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge