Ash Street Widening/Resurfacing LAP/SCOP Project
The street improvements include widening and resurfacing an existing approx. 19/20' wide road to a 24' wide paved roadway by installing limerock widening strips, reclaiming the existing asphalt, and resurfacing the approx. 1.3 mile roadway. The project will also include reworking existing and constructing new concrete sidewalks, reshaping ditches, extending, removing and adding stormwater culverts, performance turf, signage and pavement markings.