Sidewalk Repairs 2027
Work consist of 23,260 sy of seeding and mulching, 5,000 lf of concrete curb and gutter (variable), 5,000 lf of remove concrete curb and gutter, 40,025 sy of concrete sidewalk, 8,000 sy of concrete sidewalks, driveways, and aprons, 2,000 sy of concrete tree protection sidewalk, 20,000 sy of remove concrete sidewalks, driveways, and aprons, 3 ea of replace truncated domes, 20 ea of of double curb ramp, 30 ea of adjust sign post, 90 ea of adjust water meter box, 75 ea of replace & adjust water meter box & lid, 100 ea of clear & grub between sidewalk panels, 12 ea of manhole adjustment. See attached file.