Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of the following approximate quantities: 1 ls of mobilization, 2,160 tkft of track resurfacing, 750 tons of ballast, 25 lf of removal of drainage pipe, and 2,160 lf of linear grading, special (ditch grading).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Nov 30, 2025
Close: Jan 23, 2026
Toyo Denki Railway Service.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Hampton Roads Transit (HRT) has issued IFB #25-00379 seeking Ferry Repair Services. A pre-bid conference is scheduled for December 18, 2025, at 10:00 AM in Norfolk, Virginia. Bids are due by January 20, 2026, at 2:00 PM, and solicitation documents are available to registered vendors.
Posted Date
Dec 10, 2025
Due Date
Jan 20, 2026
Release: Dec 10, 2025
Close: Jan 20, 2026
Hampton Roads Transit (HRT) has issued IFB #25-00379 seeking Ferry Repair Services. A pre-bid conference is scheduled for December 18, 2025, at 10:00 AM in Norfolk, Virginia. Bids are due by January 20, 2026, at 2:00 PM, and solicitation documents are available to registered vendors.
AvailableImprove the Anderson Island Ferry landing bridge No, 33201-A and the Steilacoom Ferry landing bridge No. 31202-A by replacement of three transfer span bearings located at Bent No. 10 (two cylinder bearings and one spherical bearing) and one transfer span bearing located on the pontoon (spherical bearing), as well as replacement of the Anderson Island Ferry landing apron, and replacement of three of the Steilacoom Ferry landing transfer span bearings located on Bent No. 10 (two cylinder bearings and one spherical bearing).
Posted Date
Mar 12, 2025
Due Date
Jan 14, 2026
Release: Mar 12, 2025
Close: Jan 14, 2026
Improve the Anderson Island Ferry landing bridge No, 33201-A and the Steilacoom Ferry landing bridge No. 31202-A by replacement of three transfer span bearings located at Bent No. 10 (two cylinder bearings and one spherical bearing) and one transfer span bearing located on the pontoon (spherical bearing), as well as replacement of the Anderson Island Ferry landing apron, and replacement of three of the Steilacoom Ferry landing transfer span bearings located on Bent No. 10 (two cylinder bearings and one spherical bearing).
AvailableWork includes removal of an existing multi-span wood and steel bridge over an active railway, and the construction of a new 184' long single-span modern pre-engineered steel truss including a reinforced concrete deck, concrete barrier rail, chain link fence, guardrail, earthwork, drilled shafts, concrete abutments, rock blanket, roadway construction, traffic control, erosion control, utility relocation, and all appurtenances. See attached file.
Posted Date
Nov 20, 2025
Due Date
Feb 4, 2026
Release: Nov 20, 2025
Close: Feb 4, 2026
Work includes removal of an existing multi-span wood and steel bridge over an active railway, and the construction of a new 184' long single-span modern pre-engineered steel truss including a reinforced concrete deck, concrete barrier rail, chain link fence, guardrail, earthwork, drilled shafts, concrete abutments, rock blanket, roadway construction, traffic control, erosion control, utility relocation, and all appurtenances. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →