Wastewater System Capacity Improvements Basins 4 and 6 *REBID
Apr 16, 2026
Closes
Sep 1, 2026
Construct new sanitary sewer pipe or sanitary sewer pipe replacement in Basins 4 and 6 includes 10 LF 6" N-12 HDPE storm pipe open cut trench, 175 LF 12" N-12 HDPE storm pipe open cut trench, 1,010 LF 18" PVC sanitary sewer pipe open cut trench, 1,443 LF 24" PVC sanitary sewer pipe trenchless installation, 5 EA new 48" manhole 6-10 FT deep, 3 EA rechannel existing manhole, 94 LF 4" and 6" sanitary sewer laterals new >5FT of service line, 17 CY fill sewer pipe with CLSM, 5,026 LF post construction CCTV of new or rehabilitated sewer mains, 1 EA construct sanitary sewer cleanout, 203 LF 6" ductile iron potable water pipe class 50 w/fittings, couplings & restrained joints and class B backfill.