Open RFP

Issaquah Elevator Pit Water Intrusion Mitigation

Description: Install a new curtain wall system at the northwest corner of the elevator shaft to prevent rainwater from seeping in through the door sills. Install a pump system in the elevator pit to automatically remove water when detected. Other planned repairs include roof work, both interior and exterior panel replacements for the elevator shaft, waterproofing, installing a pedestrian cable barrier, relocating CCTV camera, lights and artwork, and painting. Major subcontracting opportunities include: Structural steel and precast concrete ; glass and glazing; roofing; siding; drywall and insulation; electrical and other wiring installation; other building finishing; plumbing, heating and air-conditioning; painting and wall covering; and all other specialty trade contractors.

Released
Aug 20, 2026
Closes
Sep 22, 2026(19 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts