CityWA
Posted
Oct 21, 2026
Nov 10, 2026
Removal and Replacement of Water Pump Station Doors, Phase 1 (Invitation to Bid)
Remove and replace seven water pump station doors at seven different locations.
Description: INVITATION TO BID Separate sealed bids for construction of Northwest Side Water Main Replacement -- Phase 2, (OF 1736.1) will be received by the City Clerk at the office of the City Clerk, Room 204, Civic Center, P.O. Box 5021, Great Falls, Montana 59403, #2 Park Drive, Great Falls, MT 59401, until 9:00 a.m. local time on November 18, 2026, and then publicly opened and read aloud thereafter in the Commission Chambers at the Great Falls Civic Center. The project consists of approximately: 500 lineal feet of 12-inch PVC water main replacement; 2,700 lineal feet of 8-inch PVC water main replacement; remove and replace 7 fire hydrants; 37 - ¾-inch or 1-inch water service connections; 2 -- 1.5-inch or 2-inch water service connections; 1,500 square yards of 1½-inch minus 12" thick base course gravel; and 1,500 square yards of 4" asphalt removal and replacement. The contract documents consisting of Drawings and Project Manual may be examined or obtained at the office of City Engineer at the Great Falls Public Works Department at 1025 25th Avenue NE, Great Falls, MT 59404, in accordance with the Instructions to Bidders. Required Deposit is $75.00 per set, which is not refundable. Contact the City Engineering Office at 406-771-1258 with any questions. There will be a Pre-bid conference at the City Engineering Office Conference Room at 11:00 a.m., on November 10, 2026. Interested CONTRACTORS are encouraged to attend. Bidder questions will be accepted until 5 p.m. local time on November 12, 2026 and must be provided in writing via e-mail to Matt Proud. CONTRACTOR and any of the CONTRACTOR'S subcontractors doing work on this project will be required to obtain registration with the Montana Department of Labor and Industry (DLI). Forms for registration are available from the Department of Labor and Industry, P.O. Box 8011, 1805 Prospect, Helena, Montana 59604-8011. Information on registration can be obtained by calling 1-406-444-7734. CONTRACTOR is not required to have registered with the DLI prior to bidding on this project, but must have registered prior to execution of the Construction Agreement. All laborers and mechanics employed by the CONTRACTOR or subcontractors in performance of the construction work shall be paid wages at rates as may be required by the laws of the City of Great Falls and the State of Montana. The CONTRACTOR must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, national origin, or other class protected by state or federal law. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to City of Great Falls, in an amount not less than ten percent (10%) of the total amount of the bid. Successful BIDDERS shall furnish an approved Performance Bond and Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance, as required, shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. Contractor and all subcontractors must be licensed to perform work in the City of Great Falls prior to contract award. No bid may be withdrawn after the scheduled time for public opening of bids, which is 9:00 a.m., local time on November 18, 2026. The City of Great Falls reserves the right to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid which is in the City's best interests. The City of Great Falls is an Equal Opportunity Employer. Published at Great Falls, Montana, this 1st day of November 2026. Lisa Kunz, City Clerk P.O. Box 5021 Great Falls, Montana 59403-5021 (1st Publication): November 1, 2026 (2nd Publication): November 8, 2026
City · MT, US
Adjacent opportunities open for bidding right now.
CityWA
Posted
Oct 21, 2026
Nov 10, 2026
Remove and replace seven water pump station doors at seven different locations.
CityFL
Posted
Oct 8, 2026
Nov 10, 2026
Water main replacement. Scope of work includes - 70 SY concrete driveway restoration; 1 EA concrete stair restoration; 10 SY asphalt restoration; 100 SY mill and resurface; 10 LF curb and gutter restoration; 1,090 LF 3" DR-11 PE piping - water main (includes, excavation, installation, fittings, adapters, restraints, labor, equipment, etc.) via open cut; see attached file.
Tualatin Valley Water District
Special DistrictOR
Posted
Oct 28, 2026
Nov 19, 2026
Replacement of approx. 5,290 LF of 4" and 6" cast iron water main with 4" and 8" ductile iron pipe, and 140 LF of 12" HDPE horizontal directional bore, including all services, hydrants, appurtenances, and fittings. The project includes abandonment of existing main, surface restoration, traffic control, and erosion control.
CountyVA
Posted
-
Nov 16, 2026
Project consists of the construction of Phase 1 of Henry H. Bradby Park, which includes a gravel parking lot, playground, picnic shelter, basketball court, maintenance shed, and walking trails. See attached file.
Decision makers connected to this RFP from City of Great Falls.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
425 days before RFP
The City agenda proposed awarding the Phase 1 Northwest Side Water Main Replacement construction contract for $1,626,625, with construction planned from fall 2025 through spring 2026.
Item: Construction Contract Award: Northwest Side Water Main Replacement - Phase 1, O. F. 1736.0 From: Engineering Division Initiated By: Public Works Department Presented By: Christoff Gaub, Public Works Director Action Requested: Consider Bids and Award Construction Contract Suggested Motion: 1. Commissioner moves: "I move the City Commission (award/not…
City Commission Meeting Agenda
Board meeting · Sep 2, 2025
Budget
123 days before RFP
The City's adopted FY2027 budget includes $1,700,000 for Water Main Replacements NW Side Phase 2.
Capital Maintenance, Equipment Replacement, and Facilities The adopted budget includes funding for current and future capital needs. Certain capital items receive funding with a direct allocation; some require funding over time (capital reserve fund). Certain capital items, due to their cost, require funding through a loan or bond. The FY27 budget included…
City of Great Falls FY2027 Budget
Budget · Jul 1, 2026
Agenda packet
75 days before RFP
The approved FY 2025-2026 budget lists $100,000 for Northwest Side water main replacements.
Exhibit D Approved Fiscal Year 2025-2026 City of Great Falls Budget --- Proof of Available SCIR Funds Water Fund - Distribution Water Main Replacements NW Side Discovery Meadows Cost Share Skyline Apartments Oversizing Water Master Plan (Rate Study) Water Main Replacement let Ave S 3rd St to 5th St Professional Engineering internal Engineering Unscheduled…
City Commission of Great Falls Meeting
Agenda packet · Aug 18, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (14 days left)
• Complete 9 blocks of water main replacement on Phase 2 of NW side complete the project ahead of the MDT roundabout project.
City of Great Falls FY2027 Budget
Budget · Jul 1, 2026
Water Main Replacements NW Side Phase 2 $1,700,000
FY2027 Proposed Budget
Proposed budget · Jul 1, 2026
The FY27 budget included the following capital items: • 8th Ave NW Water Main Replacement and Street Reconstruction: $3,875,000 • Sewer Redundant River Crossing: $3,000,000 • Wastewater Treatment Plant Emergency Primary Basin Repair: $1,500,000 • Water Main Replacements NW Side Phase 2: $1,700,000
City of Great Falls FY2027 Budget
Budget · Jul 1, 2026
Water Fund - Distribution Water Main Replacements NW Side $3,500,000 Discovery Meadows Cost Share $65,000 Skyline Apartments Oversizing $65,000 Water Master Plan (Rate Study) $350,000 Water Main Replacement 1st Ave S 3rd St to 5th St $900,000 Professional Engineering $100,000 Internal Engineering $404,000 Unscheduled Development $2,150,000 Total Water…
Great Falls FY2026 Proposed Budget
Proposed budget · Jul 1, 2025
Capital Outlay \| Pages 127-131 9 Major Capital Outlay Budget Water Treatment Plant Head House Repair $1,650,000 Water Treatment Plant On-Site Chlorine Generation $3,784,300 Water Treatment Plant Plate Settler $3,000,000 Water Main Replacements NW Side $3,500,000
FY2026 Proposed Budget
Proposed budget · Jul 1, 2025