CityFL
Posted
Jul 13, 2026
Sep 10, 2026
Traffic Calming: Intersection Modifications
Work includes mobilization, maintenance of traffic, inlet protection system, 42 EA litter removal and disposal, mowing, clearing and grubbing, 1963 SY removal of existing concrete, 3 EA mailbox, F&I single, 3 EA tree removal, 68.8 CY regular excavation, 47 CY embankment, 1338 SY type B stabilization, 1094 SY optional base, base group 8, 63 SY turnout construction/driveway base - optional materials, 13667 SY milling existing asphalt pavement, 1 1/2" avg depth. See attached file.