Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes furnishing labor, tools, material, and equipment, and for performing all work necessary for construction of: traffic signals, paving, signing and striping, and ada ramps. 13. 2 sta preparing row; 372 sy remov conc (pav); 82 sy remov conc (medians); 417 sy remov conc (sidewalk, ramp or sup); 747 lf remov conc (curb & gutter); 415 cy excav (roadway); 185 sy compost manuf topsoil (4"); 185 sy block sodding; 27. 5 tgl vegetative watering; 645 sy fl bs (cmp in plc)(ty a gr 1-2)(8"); 411 sy rework bs mtl (ty c)(8")(ord comp); 811 sy conc pvmt (crcp)(hes) (9"); 69 sy conc pvmt (crcp)(hes) (raised crosswalk); 8 lf drill shaft (rdwy ill pole) (30 in). See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Richardson is seeking bids for intersection improvements at Campbell Road and University Parkway, including traffic signals, paving, signing and striping, and ADA ramps. Work must comply with TxDOT and NCTCOG specifications and City of Richardson standards, with MUTCD requirements applicable and TxDOT standards applying within TxDOT right-of-way. The procurement is an ITB conducted on the City’s Bonfire portal and is currently open with documents available to registered vendors.
Posted Date
Jan 5, 2026
Due Date
Feb 10, 2026
Release: Jan 5, 2026
Close: Feb 10, 2026
The City of Richardson is seeking bids for intersection improvements at Campbell Road and University Parkway, including traffic signals, paving, signing and striping, and ADA ramps. Work must comply with TxDOT and NCTCOG specifications and City of Richardson standards, with MUTCD requirements applicable and TxDOT standards applying within TxDOT right-of-way. The procurement is an ITB conducted on the City’s Bonfire portal and is currently open with documents available to registered vendors.
AvailableThe City of Cape Coral is soliciting bids to construct traffic signal and intersection improvements at the intersection of Chiquita Boulevard and Embers Parkway. Bids must be submitted electronically through the City’s IonWave portal; a public opening will occur at Cape Coral City Hall. The solicitation includes specifications, plans, and forms provided as attachments in the bid listing.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
The City of Cape Coral is soliciting bids to construct traffic signal and intersection improvements at the intersection of Chiquita Boulevard and Embers Parkway. Bids must be submitted electronically through the City’s IonWave portal; a public opening will occur at Cape Coral City Hall. The solicitation includes specifications, plans, and forms provided as attachments in the bid listing.
Construction of intersection improvements at 980 South Mill Road, Heber City, Utah. This includes removal of existing asphalt, curb and gutter, and sidewalk; installation of new curb and gutter, sidewalk improvements, and pedestrian crossing infrastructure; traffic calming measures; and re-striping of crosswalks, driving, and bike lanes.
Posted Date
Dec 13, 2025
Due Date
Jan 13, 2026
Release: Dec 13, 2025
Close: Jan 13, 2026
Construction of intersection improvements at 980 South Mill Road, Heber City, Utah. This includes removal of existing asphalt, curb and gutter, and sidewalk; installation of new curb and gutter, sidewalk improvements, and pedestrian crossing infrastructure; traffic calming measures; and re-striping of crosswalks, driving, and bike lanes.
AvailableThe major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
Posted Date
Oct 29, 2025
Due Date
Jan 15, 2026
Release: Oct 29, 2025
Close: Jan 15, 2026
The major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis