CityCA
Posted
Aug 24, 2026
Sep 30, 2026
Traffic Signal Improvements Project (Various Locations) RFP
Traffic signal improvements project (various locations).
Description: Work includes clearing and grubbing, 846 LF removing guardrail, 289 LF removing curb, removing headwalls, 2 EA removing inlets, 11 EA removing guardrail end anchor (all type), 605 CY unclassified excavation, 1,155 CY borrow excavation (loose truckbed measurement)(a-2-4(0) or a-4(0), 11 sta machine grading shoulders, 6 rbst roadbed processing, 100 SY geosynthetic reinforcement for soft soil stabilization, type 2, 7 CY cement mortar flowable backfill, mix 2, 1,147 SY crushed aggregate base course, type b, road mixed, 6" compacted thickness, 1,147 SY bituminous treatment a. See attached file.
SpecialDistrict · AL, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityCA
Posted
Aug 24, 2026
Sep 30, 2026
Traffic signal improvements project (various locations).
CityCA
Posted
Aug 24, 2026
Sep 30, 2026
Traffic signal improvements project (various locations).
CityIL
Posted
Sep 4, 2026
Sep 29, 2026
Performed consists of roadway widening, curb and gutter removal and replacement, concrete median installation, sidewalk installation, and all incidental and collateral work necessary to complete the improvement.
CountyAL
Posted
Aug 26, 2026
Sep 15, 2026
Project scope includes intersection improvements and the constructionof new turn lanes at two different intersections along mooresvilleroad. Project work areas are at theintersection of mooresville roadand old highway 20 and the intersection of mooresville road andhuntsville brownsferry road
Decision makers connected to this RFP from Alabama Department of Transportation.