Installation of Transfer Switches & Emergency Generator RFP
Provide installation of transfer switches & emergency generator.
Description: Provide installation of transfer switches & emergency generator.
SpecialDistrict · LA, US
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
55 days before RFP
The Jacobs scope proposed evaluating East Facility modernization improvements that could include standby and backup power generation systems for critical maintenance operations.
As part of the broader conceptual design effort, Jacobs will prepare a Facility Improvement Plan evaluating opportunities to improve operational efficiency, consolidate fleet functions, modernize aging infrastructure, accommodate future growth, and support long-term capital conceptual design objectives. The conceptual design effort will evaluate vehicle…
New Orleans Regional Transit Authority Meeting Agenda
Agenda packet · Jul 21, 2026
RFP published
Proposals due (1 days left)
Decision makers connected to this RFP from Regional Transit Authority.
Adjacent opportunities open for bidding right now.
Special DistrictLA
Posted
Sep 14, 2026
Nov 11, 2026
Provide installation of transfer switches & emergency generator.
Chattahoochee County School District
School DistrictGA
Posted
Oct 30, 2026
Dec 18, 2026
Design-build assessment and turnkey installation of emergency backup generator systems at two Chattahoochee County School District facilities.
Indigenous GovernmentFL
Posted
Nov 5, 2026
Nov 23, 2026
Requesting bids from qualified contractors to provide standby generator installation services needed at the Brighton Reservation.
North Dakota Mill and Elevator Association
State AgencyND
Posted
Nov 6, 2026
Dec 3, 2026
Project includes Phase 1: The final installation of an owner provided 2250 kW, 2813 kVA, 480Y/277V Cummins diesel generator and sub-base fuel tank and an owner provided 2500 kVA step-up transformer, 480Y/277V to 4160V Delta. The project would include all conduit, conductors, and control conductors for a complete generator installation for automatic peak reduction as needed. The generator, sub-base fuel tank and an owner provided transformer have been installed in a previous project, but the conductor installation and final programming has not been completed. Phase 2: The installation of an owner provided 2250 kW, 2813 kVA, 480Y/277V Cummins diesel generator and sub-base fuel tank and an owner provided 2500 kVA step-up transformer, 480Y/277V to 4160V Delta. The project would include all conduit, conductors, and control conductors for a complete generator installation for automatic peak reduction as needed. The concrete pad for the generator and transformer shall be included by the electrical contractor for the Phase 2 portion of the project.