Description: Installation of ductile iron water mains. Scope of work includes - 1 LS provide trench excavation, solid sheeting, shoring and bracing and equivalent method for protection of workers; 1 LS provide potholing services for the identification of existing site conditions and utilities; 1 EA furnish and install loop detectors; 1 LS furnish and install final paving; 1 LS furnish and install channelization/ striping, pavement markings; see attached file.
City · CA, US
Decision makers connected to this RFP from City of Pasadena.
From the first pre-RFP signals to the published RFP and its files.
Capital improvement plan
603 days before RFP
The recommended FY 2026–2030 CIP listed a $67.9 million Water System Distribution Mains programme to replace aging pipelines, with $40.9 million shown for FY 2026–2030.
Department of Public Works Water System Distribution Mains (Total Estimated Cost $67.9M; Appropriated through FY 2025 $27M; FY 2026 - FY 2030 $40.9M) • Project Highlights: ➢ Water System and Resources Plan priorities ➢ Replaces aging pipeline ➢ Improves system reliability • Northwest Project: Fair Oaks Avenue ➢ Washington Blvd. to Montana Street ➢ 12-inch…
Adjacent opportunities open for bidding right now.
CityPA
Posted
Nov 17, 2026
Dec 8, 2026
Pasadena Department of Public Works Capital Improvement Program 2026-2030
Capital improvement plan · Mar 11, 2025
PASADENA MEDIA: This is an overview of the 2026 budget plan. So total funding of 64.2 2 million dollars PASADENA MEDIA: of that debt is planned for about 42% of that through the wifia program that we'll be applying to 21.6 million is from ratepayer funds reimbursement. Others includes the NASA reimbursement for the explorer. Well, we also grants and system…
Finance Committee And/Or City Council Special Meeting Notice
Board meeting · Apr 28, 2025
Board meeting
589 days before RFP
PWP proposed a WIFIA-financed Water Infrastructure Program including replacement of about 11 miles of aging water mains.
This memorandum is for information only. BACKGROUND: Pasadena Water and Power ("PWP") plans to submit an application to the U.S. Environmental Protection Agency's ("EPA") federally subsidized Water Infrastructure Finance and Innovation Act ("WIFIA") loan program to partially finance three critical infrastructure projects that are cumulatively titled the…
Municipal Services Committee Regular Meeting
Board meeting · Mar 25, 2025
LOAN APPLICATION FOR THE WATER INFRASTRUCTURE FINANCE AND INNOVATION ACT ("WIFIA") David Reyes, Interim General Manager of Water and Power, provided introductory comments, and Lynne Chaimowitz, Assistant General Manager of Water and Power, summarized the staff memo as part of the PowerPoint presentation on the item, including providing information on the…
Municipal Services Committee Special Meeting
Board meeting · May 13, 2025
Strategic plan
306 days before RFP
The City’s mitigation action plan lists Action 20 as an ongoing program to schedule resilient piping for new or replacement water distribution pipelines.
2 0 In iti a te a p ro g ra m t o s ch e du le in st a lla tio n o f re si lie n t (s e is m ic al ly a pp ro p ria te ) p ip in g f o r ne w o r re p la ce m en t w at e r di st rib u tio n p ip e lin es . (H a za rd s a dd re ss e d: S e is m ic ) G e n e ra l F u nd , H M G P G ra n ts W a te r a nd P o w e r $ $ $$ O n g o in g - Y e a rl y H ig h
City of Pasadena Local Hazard Mitigation Plan 2025-2029
Strategic plan · Jan 2, 2026
Capital improvement plan
183 days before RFP
Pasadena Water and Power proposed FY 2027 design and replacement of the water main on Catalina Avenue from Corson Street to California Boulevard.
Pasadena Water and Power Water System Highlights: Water Distribution Projects Atlanta, Eagle Rock, and Santa Anita Booster Station Improvements Water Mainline Replacements Installation of new and replaced water distribution mains at various locations throughout the city • FY 2027 Workplan: Design and replacement of mainlines on the following locations: •…
Pasadena Water and Power Capital Improvement Program 2027-2031
Capital improvement plan · May 5, 2026
Exhibit B Adopted FY 2027 - 2031 Capital Improvement Program Total Estimated Costs Adopted FY 2027 Funding Detail 1,800,000Pasadena Center Improvements Total Appropriations: XVII Water System 600,00013,900,000Don Benito Reservoir Replacement (1099)1 Water Fund150,000 Federal Emergency Management Agency450,000 10,530,50089,180,500Distribution Mains (Through…
City of Pasadena Capital Improvement Program 2027-2031
Capital improvement plan · May 4, 2026
RFP published
Proposals due (15 days left)
The City of Philadelphia Water Department is soliciting prequalification for Bid 2988 (Work No. 20417), which covers relaying water mains on Devereaux Avenue, constructing green stormwater infrastructure on Jackson Street, and abandoning and filling water mains on Devereaux Avenue. The solicitation is for prequalification only, and approved sellers will be invited to the later closed bid solicitation; the estimated value exceeds $5 million. The qualified-seller questionnaire is due December 8, 2026, and the advertisement separately lists January 7, 2027 as the quote deadline for the subsequent bid.
CityNC
Posted
Nov 6, 2026
Dec 3, 2026
Construction services for the West New Bern Water System Improvements are being procured as two contracts: Contract I (General) and Contract II (Tank & Foundations). Contract I includes approximately 22,000 linear feet of 12- and 16-inch PVC and DIP water transmission main, 900 linear feet of fused PVC directional bores, about 8,000 linear feet of 12-inch PVC and DIP sewer force main, installation of an altitude valve vault, electrical and SCADA at the new elevated storage tank site, and associated sitework. Contract II includes construction of a new 500,000-gallon elevated storage tank and its foundations.
San Francisco Public Utilities Commission
Special DistrictCA
Posted
Oct 19, 2026
Dec 3, 2026
Work consists of replace approx 3.50 miles of 8" ductile iron water mains, upgrade sewer lines and complete paving renovation.
CityNY
Posted
Nov 20, 2026
Dec 4, 2026
The contract procures installation and emergency repair services for water mains and related appurtenances for the Inc. Village of Bayville under H2M Project No.: BAYV2650. Complete bidding documents are available as hard copy from REV (hard copy requires a $100 deposit, refundable per the Information for Bidders) or as a digital download from the H2M planroom (non‑refundable $100 fee), and bidders are urged to register to receive addenda. Proposals must be submitted as sealed bids to the Village Administrator and include a certified check or bid bond equal to at least five percent of the total bid; bids will be publicly opened on December 4, 2026.