CityMI
Posted
Oct 26, 2026
Nov 24, 2026
James St Water Main Replacement RFP
This work shall include the furnishing of all labor, materials and construction equipment necessary for all excavation and backfill work indicated on the drawings or specified herein. Under this item, the contractor shall install the water mains of the types and sizes as shown on the plans, including all fittings and other appurtenances and the making of all connections. The contractor shall furnish all labor and materials to restore all surface improvements disturbed by his operations as specified herein or under another item or as noted in the drawings. Under this item the contractor shall open trenches and renew water services as shown on the plans or required. Existing services scheduled for renewal shall be disconnected coincident with the installation of the new service leads in a manner which shall reduce the interruption of customer’s water supply to a minimum. Contractor is responsible for providing notification to residents before interruption of water supply occurs.
