Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of approx. 1,350 LF of 1-1/2" poly pipe, for a potable water supply line.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of convert potable water irrigation system to recycled water, include 45,500 SF of rolled erosion control product; 48,700 SF of weed germination; 17,088 LF of (f) - 1" plastic pipe (schedule 40) (supply line); 7,699 LF of (f) - 1 1/4" plastic pipe (schedule 40) (supply line); 5,250 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 9,664 LF of (f) - 3" plastic pipe (class 315) (supply line); 5,145 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 3,615 LF of (f) - 4" plastic pipe (class 315) (supply line). See outside link.
Posted Date
Nov 12, 2024
Due Date
Jan 8, 2026
Release: Nov 12, 2024
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of convert potable water irrigation system to recycled water, include 45,500 SF of rolled erosion control product; 48,700 SF of weed germination; 17,088 LF of (f) - 1" plastic pipe (schedule 40) (supply line); 7,699 LF of (f) - 1 1/4" plastic pipe (schedule 40) (supply line); 5,250 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 9,664 LF of (f) - 3" plastic pipe (class 315) (supply line); 5,145 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 3,615 LF of (f) - 4" plastic pipe (class 315) (supply line). See outside link.
AvailableProvide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailableFurnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main pipe. Also included are three (3) directional drills, valves, connections, restoration, the equipping of two (2) potable water supply wells and providing two (2) generators.
Posted Date
Nov 12, 2025
Due Date
Jan 8, 2026
Release: Nov 12, 2025
Close: Jan 8, 2026
Furnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main pipe. Also included are three (3) directional drills, valves, connections, restoration, the equipping of two (2) potable water supply wells and providing two (2) generators.
AvailableFurnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main pipe. Also included are three (3) directional drills, valves, connections, restoration, the equipping of two (2) potable water supply wells and providing two (2) generators.
Posted Date
Nov 12, 2025
Due Date
Jan 8, 2026
Release: Nov 12, 2025
Close: Jan 8, 2026
Furnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main pipe. Also included are three (3) directional drills, valves, connections, restoration, the equipping of two (2) potable water supply wells and providing two (2) generators.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →