Retrieving RFP details
Release
Close
California Department of Transportation
Work consists of convert potable water irrigation system to recycled water, include 45,500 SF of rolled erosion control product; 48,700 SF of weed germination; 17,088 LF of (f) - 1" plastic pipe (schedule 40) (supply line); 7,699 LF of (f) - 1 1/4" plastic pipe (schedule 40) (supply line); 5,250 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 9,664 LF of (f) - 3" plastic pipe (class 315) (supply line); 5,145 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 3,615 LF of (f) - 4" plastic pipe (class 315) (supply line). See outside link.
Fresno Unified School District
Work consists of convert domestic irrigation to a recycled water source with swivel-ell backflow prevention.
City and County of San Francisco
On-site treatment and reuse of Non-potable Water System (ONWS). non-potable on-site treatment system to supply in-building non-potable demands (i.e., toilet and urinal flushing).
City of Clearwater
Provide potable and reclaimed water meters.
Release
Nov 12, 2024
Close
Jan 08, 2026