Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main pipe. Also included are three (3) directional drills, valves, connections, restoration, the equipping of two (2) potable water supply wells and providing two (2) generators.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Furnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main pipe. Also included are three (3) directional drills, valves, connections, restoration, the equipping of two (2) potable water supply wells and providing two (2) generators.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Close: Dec 18, 2025
Furnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main pipe. Also included are three (3) directional drills, valves, connections, restoration, the equipping of two (2) potable water supply wells and providing two (2) generators.
AvailableThe City of Palm Coast issued ITB-UT-26-07 for the WTP #1 Wellfield Expansion to furnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main, including three directional drills, valves, connections, restoration, the equipping of two potable water supply wells, and providing two generators. Submissions are managed through the City’s Bonfire portal and require the listed forms, bid security, licenses, and signed addenda as applicable. The opportunity opened Nov 12, 2025 and closes Dec 18, 2025; questions were due Dec 9, 2025 and an Intent to Bid is due Dec 17, 2025.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Close: Dec 18, 2025
The City of Palm Coast issued ITB-UT-26-07 for the WTP #1 Wellfield Expansion to furnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main, including three directional drills, valves, connections, restoration, the equipping of two potable water supply wells, and providing two generators. Submissions are managed through the City’s Bonfire portal and require the listed forms, bid security, licenses, and signed addenda as applicable. The opportunity opened Nov 12, 2025 and closes Dec 18, 2025; questions were due Dec 9, 2025 and an Intent to Bid is due Dec 17, 2025.
AvailableReplacement of approx. 2,200 LF of 6" cast iron water main with 8" and 4" ductile iron restrained joint water main and related appurtenances, replacement of approx. 50 residential water services, connection to existing water mains, service transfers, and restoration including pavement patch and overlay.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Replacement of approx. 2,200 LF of 6" cast iron water main with 8" and 4" ductile iron restrained joint water main and related appurtenances, replacement of approx. 50 residential water services, connection to existing water mains, service transfers, and restoration including pavement patch and overlay.
AvailableWork includes approx 10,000 LF 12"-16" HDPE and DI waterline and all required appurtenances. See attached file.
Posted Date
Dec 1, 2025
Due Date
Dec 19, 2025
Release: Dec 1, 2025
Close: Dec 19, 2025
Work includes approx 10,000 LF 12"-16" HDPE and DI waterline and all required appurtenances. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis