Minneapolis-St Paul Metropolitan Airports Commission
Special DistrictMN
Posted
Aug 5, 2026
Sep 22, 2026
Uninterruptible Power Supply (UPS) (Request for Proposal)
Uninterruptible Power Supply (UPS).
Description: Removal and replacement two UPS units Model Number Libert AP341 and Mitsubishi UP2033D-D203DU-2 that have reached the end of their useful life. These units shall be replaced with two 50 kVA identical next generation parallel redundant UPS modules one at a time without any interruption to critical loads.
StateAgency · MA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Minneapolis-St Paul Metropolitan Airports Commission
Special DistrictMN
Posted
Aug 5, 2026
Sep 22, 2026
Uninterruptible Power Supply (UPS).
Pecos Valley Artesian Conservancy District
Special DistrictNM
Posted
Aug 26, 2026
Oct 1, 2026
Fence installation.
Posted
Aug 25, 2026
Sep 8, 2026
Furnish and install 2 ea freezer UPS systems.
Federal Bureau of Investigation
FederalDC
Posted
Jul 27, 2026
Sep 9, 2026
The Contractor must provide maintenance, repairs, and replacements of the UPS units located at FBI sites across the U.S. and its territories. The Contractor must be able to support the FBI’s diverse UPS fleet from several manufacturers, including but not limited to APC Schneider, Eaton, Emerson, Liebert, Vertiv, MGE, and Staco. The size and configuration of units vary by location. The Contractor is required to perform planned preventive and corrective maintenance, testing, replacement of failed or aging components (included but not limited to batteries, capacitors, and fans), and unplanned emergency repair services for the UPS units. The Contractor shall provide services to keep the UPS systems functioning with an appropriate operational capacity safety factor between 20-25%, while operating at greater than 90% efficiency for legacy systems and 95% for replacement systems installed within the past 2 years or in the future. The Contractor will respond to UPS failures, alarms, or performance issues by providing a 24/7 emergency response line. See attached file.
Decision makers connected to this RFP from Massachusetts Bay Transportation Authority.