Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of work includes replacement of oxidation ditch aerators and associated equipment with electrical. Removal of sludge from oxidation ditch. Additive alternate for replacement of oxidation ditch weir gate. Replacement of clarifier No. 2 valves with associated concrete walkways. Cleaning of clarifier No. 2 piping. Removal of sludge from clarifier No. 2. Additive alternate for repair of clarifier No. 1 skimmer, skimmer support and skimmer arm.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes waste water treatment plant improvements.
Posted Date
Nov 24, 2025
Due Date
Feb 3, 2026
Release: Nov 24, 2025
Close: Feb 3, 2026
Work includes waste water treatment plant improvements.
AvailableConstruction of a new centralized wastewater treatment plant including new headworks, grit removal, process building, secondary treatment process and associated concrete basins, aeration system, blowers, onsite lift stations, tertiary filtration for metals removal, UV disinfection system, dewatering equipment, chemical feed equipment, silo, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal. Also included is a new lift station at the Henderson WWTP and force main from the Henderson to Veteran's WWTP site for consolidation of all wastewater treatment at the Veteran’s site. Also included are several collection system improvement components throughout the city's collection system. Finally, an office and laboratory building is included.
Posted Date
Dec 5, 2025
Due Date
Feb 19, 2026
Release: Dec 5, 2025
Close: Feb 19, 2026
Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building, secondary treatment process and associated concrete basins, aeration system, blowers, onsite lift stations, tertiary filtration for metals removal, UV disinfection system, dewatering equipment, chemical feed equipment, silo, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal. Also included is a new lift station at the Henderson WWTP and force main from the Henderson to Veteran's WWTP site for consolidation of all wastewater treatment at the Veteran’s site. Also included are several collection system improvement components throughout the city's collection system. Finally, an office and laboratory building is included.
AvailableProcurement of engineering firms for design, bidding, and funding services for improvements at the Wastewater Treatment Plant, including enhancements to raw wastewater pumping, screening, flow monitoring, grit removal, preliminary treatment odor control, UV effluent disinfection, effluent pumping, and ADA compliance.
Posted Date
Jan 16, 2026
Due Date
Feb 26, 2026
Release: Jan 16, 2026
Close: Feb 26, 2026
Procurement of engineering firms for design, bidding, and funding services for improvements at the Wastewater Treatment Plant, including enhancements to raw wastewater pumping, screening, flow monitoring, grit removal, preliminary treatment odor control, UV effluent disinfection, effluent pumping, and ADA compliance.
AvailableContract 1 involves supplying, erecting and placing in operation a packaged wastewater treatment system to augment the existing Guthrie municipal wastewater treatment plant. Contract 2 involves clearing and grubbing of the new plant site. Contract 3 involves fencing the new plant site. The work is located in Guthrie, Todd County, Kentucky at or adjacent to the existing wastewater treatment plant and is to be performed in accordance with contract documents and specifications.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
Contract 1 involves supplying, erecting and placing in operation a packaged wastewater treatment system to augment the existing Guthrie municipal wastewater treatment plant. Contract 2 involves clearing and grubbing of the new plant site. Contract 3 involves fencing the new plant site. The work is located in Guthrie, Todd County, Kentucky at or adjacent to the existing wastewater treatment plant and is to be performed in accordance with contract documents and specifications.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis