Kansas City Board of Public Utilities
Special DistrictKS
Posted
Oct 28, 2026
Nov 18, 2026
On-Call Industrial Painting Services (Request for Proposal)
On-call industrial painting services. 1. Contractor shall perform the following: a. Remove all existing paint and/or wall coverings. b. Provide all necessary equipment, tools, and materials required to complete the interior/exterior painting work. c. Removal of existing paint. d. Washing and disinfection. e. Mudding and taping of all drywall joints. f. Sand walls as required for uniform smooth finish. g. Application of primer. h. Application of two (2) coats of paint, minimum, with no bleed through after final coats. 2. Contractor shall provide all necessary equipment, tools, and materials required to complete the interior painting work. 3. Work areas are always to be kept clean both during the project(s) and upon completion. a. All paint drips, spills, over painting, etc. shall be cleaned up. b. All sheet rock dust must be contained during project and vacuumed upon completion. 4. Contractor shall ensure proper protection of furniture, floors, fixtures, and other items from paint splatter or damage during the painting process. 5. All material and workmanship shall meet building standards. 6. All Contractor’s material, debris, and trash shall be removed from the premises. Building dumpsters shall not be used for disposal. 7. Contractor shall meet all licensing and permitting requirements for Industrial painting.
