Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include construction of a new outdoor sheltered aisle metal-clad switchgear, 15kv class with 4.16kv distribution. The switchgear will be a main-tie-main configuration having one utility source from radford electric department (red) and one from a new campus generation facility. The switchgear will serve six moveable open point distribution loops, each having one breaker on each of the two switchgear buses. Significant civil excavation to site the switchgear into an existing embankment. Construction of a semi-below-grade cable vault that acts as the foundation for the metal-clad switchgear
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Seeking to transition swiftly and efficiently from its current on-premises infrastructure to a cloud-based environment, hosted by one of the following providers with an active Master Cloud Services Agreement (MCSA) with the State: Amazon Web Services (AWS) – MCSA0080; Google Cloud – MCSA0095; Microsoft Azure – MCSA0092 / CSP029109; Oracle Cloud Infrastructure (OCI) – MCSA0073.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
Seeking to transition swiftly and efficiently from its current on-premises infrastructure to a cloud-based environment, hosted by one of the following providers with an active Master Cloud Services Agreement (MCSA) with the State: Amazon Web Services (AWS) – MCSA0080; Google Cloud – MCSA0095; Microsoft Azure – MCSA0092 / CSP029109; Oracle Cloud Infrastructure (OCI) – MCSA0073.
AvailableProject consist of the installation: upgrades inside the pump station shall include replacement of the motor control center (mcc) and associated medium voltage transformers, demolition/abandonment of older systems affected by the replacement of the mcc; reconnection of low voltages equipment to the new motor control center; addition of an automatic transfer switch upstream of new mcc; replacement of existing four variable frequency drives for the 600hp pumps; contractor to troubleshoot the existing switchgear to resolve the "power- flicker" issue; contractor shall implement solution where switchgear transfer scheme controller responds to single-phase and three-phase events on the vepco system. See attached file.
Posted Date
Nov 24, 2025
Due Date
Jan 15, 2026
Release: Nov 24, 2025
Close: Jan 15, 2026
Project consist of the installation: upgrades inside the pump station shall include replacement of the motor control center (mcc) and associated medium voltage transformers, demolition/abandonment of older systems affected by the replacement of the mcc; reconnection of low voltages equipment to the new motor control center; addition of an automatic transfer switch upstream of new mcc; replacement of existing four variable frequency drives for the 600hp pumps; contractor to troubleshoot the existing switchgear to resolve the "power- flicker" issue; contractor shall implement solution where switchgear transfer scheme controller responds to single-phase and three-phase events on the vepco system. See attached file.
Provide electrical consulting services on an as needed basis. The consultant will assist the city with planning, project review and technical expertise for current and future projects within city-owned facilities, infrastructure, and capital improvement projects. Review electrical plans that may include designs, drawings, and specifications for city projects according to city standards and all applicable codes. Provide recommendations for efficiency, reliability, and improvements. Meeting with architects, engineers, subcontractors and city staff. Review of bid documents and technical specifications. Conduct site visits, inspections, and evaluations during construction. See outside link.
Posted Date
Nov 4, 2025
Due Date
Jan 6, 2026
Release: Nov 4, 2025
Close: Jan 6, 2026
Provide electrical consulting services on an as needed basis. The consultant will assist the city with planning, project review and technical expertise for current and future projects within city-owned facilities, infrastructure, and capital improvement projects. Review electrical plans that may include designs, drawings, and specifications for city projects according to city standards and all applicable codes. Provide recommendations for efficiency, reliability, and improvements. Meeting with architects, engineers, subcontractors and city staff. Review of bid documents and technical specifications. Conduct site visits, inspections, and evaluations during construction. See outside link.
Provide services of a consulting firm, individual, or organization to apply for and administer the programs such as critical infrastructure, targets of opportunity and residential public infrastructure grants, and related programs.
Posted Date
Dec 2, 2025
Due Date
Dec 19, 2025
Release: Dec 2, 2025
Close: Dec 19, 2025
Provide services of a consulting firm, individual, or organization to apply for and administer the programs such as critical infrastructure, targets of opportunity and residential public infrastructure grants, and related programs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis