Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Los Alamos County (Utilities - Electric Distribution) issued IFB26-48 to construct foundation piers for the White Rock Substation, specifying drilling and constructing five foundation piers with detailed concrete and reinforcement requirements. The solicitation is a formal IFB (construction procurement), requires New Mexico contractor licensing, bid forms, bonds, and compliance with public works wage rules and resident/local preference provisions. The opportunity is open with submissions due January 27, 2026, and includes supporting documents and an addendum posted on the buyer portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide substation control panels.
Posted Date
Jan 8, 2026
Due Date
Jan 30, 2026
Release: Jan 8, 2026
Close: Jan 30, 2026
Provide substation control panels.
AvailableApplication for authorization to install piers, docks, and boat lifts within the Summer Village of Rochon Sands for the year 2026.
Posted Date
-
Due Date
Dec 31, 2026
Close: Dec 31, 2026
Application for authorization to install piers, docks, and boat lifts within the Summer Village of Rochon Sands for the year 2026.
AvailableDisposal of substation equipment.
Posted Date
Jan 12, 2026
Due Date
Feb 10, 2026
Release: Jan 12, 2026
Close: Feb 10, 2026
Disposal of substation equipment.
AvailableProject consists of replacement of the main high-voltage electrical substation including replacement of disconnects, circuit breakers, surge arresters, transformers and medium-voltage switchgear; demolition of the existing carpenter shop, installation of a new structural foundation and piles, hazardous material abatement, demolition of the existing substation area, completion of related site work and restoration of the existing substation area to a topsoiled area.
Posted Date
Dec 16, 2025
Due Date
Feb 12, 2026
Release: Dec 16, 2025
Close: Feb 12, 2026
Project consists of replacement of the main high-voltage electrical substation including replacement of disconnects, circuit breakers, surge arresters, transformers and medium-voltage switchgear; demolition of the existing carpenter shop, installation of a new structural foundation and piles, hazardous material abatement, demolition of the existing substation area, completion of related site work and restoration of the existing substation area to a topsoiled area.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis