Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Onondaga County in New York is soliciting bids to furnish materials and/or services for the Metro Substation Asset Renewal Project. The solicitation was published on December 16, 2025 and bids are due February 12, 2026 at 2:00 PM EST via BidNet Direct. Full specifications and documents are available to registered vendors on the BidNet Direct portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide fuseless shunt capacitor bank for substation project.
Posted Date
Dec 8, 2025
Due Date
Jan 19, 2026
Release: Dec 8, 2025
Close: Jan 19, 2026
Provide fuseless shunt capacitor bank for substation project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish and deliver a new substation transformer and/or two 138kv substation breakers, and/or one 138kv circuit switcher with integral disconnect switch. The Project includes the following equipment: Bid Group A: Furnish and deliver, including any necessary labor and materials needed to provide one new, 138 kV to 13.8 kV, 30/40/50 MVA transformers. This shall include offloading, assembly, oil top off and testing of the transformer by the manufacturer. and/or Bid Group B: Furnish and deliver, including any necessary labor and materials needed to provide two new, 138 kV gas insulated breakers for use in the Substation. and/or Bid Group C: Furnish and deliver, including any necessary labor and materials needed to provide one new, 138 kV gas insulated circuit switcher with integral disconnect switch, mounting pedestal and anchor bolts.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Furnish and deliver a new substation transformer and/or two 138kv substation breakers, and/or one 138kv circuit switcher with integral disconnect switch. The Project includes the following equipment: Bid Group A: Furnish and deliver, including any necessary labor and materials needed to provide one new, 138 kV to 13.8 kV, 30/40/50 MVA transformers. This shall include offloading, assembly, oil top off and testing of the transformer by the manufacturer. and/or Bid Group B: Furnish and deliver, including any necessary labor and materials needed to provide two new, 138 kV gas insulated breakers for use in the Substation. and/or Bid Group C: Furnish and deliver, including any necessary labor and materials needed to provide one new, 138 kV gas insulated circuit switcher with integral disconnect switch, mounting pedestal and anchor bolts.
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Posted Date
Nov 22, 2025
Due Date
Jan 8, 2026
Release: Nov 22, 2025
Close: Jan 8, 2026
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Upgrade of the existing main substation no 1 installation of new power infrastructure (including transformer, switchgears, service feeds etc) site work such as building and flatwork demolition as well as surface restoration, and other general exterior improvements. The main substation construction includes a secant pile support of excavation system, concrete substructure, steel framing, architectural finishes, a fire alarm system and HVAC, etc.
Posted Date
Dec 29, 2025
Due Date
Jan 29, 2026
Release: Dec 29, 2025
Close: Jan 29, 2026
Upgrade of the existing main substation no 1 installation of new power infrastructure (including transformer, switchgears, service feeds etc) site work such as building and flatwork demolition as well as surface restoration, and other general exterior improvements. The main substation construction includes a secant pile support of excavation system, concrete substructure, steel framing, architectural finishes, a fire alarm system and HVAC, etc.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →