Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Substation Line Extension Project work includes 1 EA furnish & install 8' * 20' * 9' - 4" traffic rated vault with (1) manhole & 5' * 8' opening per CU 1600-3L complete vault installation and surface restoration; 2 EA furnish and install 8' * 14' * 9' - 4" traffic rated vault with (1) manhole & 5' * 8' opening per CU 1600-3K. Complete vault installation and surface restoration; see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of the cyber park substation stormwater management improvements.
Posted Date
Jan 13, 2026
Due Date
Feb 12, 2026
Release: Jan 13, 2026
Close: Feb 12, 2026
Construction of the cyber park substation stormwater management improvements.
AvailableProject consists of replacement of the main high-voltage electrical substation including replacement of disconnects, circuit breakers, surge arresters, transformers and medium-voltage switchgear; demolition of the existing carpenter shop, installation of a new structural foundation and piles, hazardous material abatement, demolition of the existing substation area, completion of related site work and restoration of the existing substation area to a topsoiled area.
Posted Date
Dec 16, 2025
Due Date
Feb 12, 2026
Release: Dec 16, 2025
Close: Feb 12, 2026
Project consists of replacement of the main high-voltage electrical substation including replacement of disconnects, circuit breakers, surge arresters, transformers and medium-voltage switchgear; demolition of the existing carpenter shop, installation of a new structural foundation and piles, hazardous material abatement, demolition of the existing substation area, completion of related site work and restoration of the existing substation area to a topsoiled area.
AvailableThe Project consists of the installation of approx. 5,165 LF of 1.5IN, 2IN, 3IN, and 4IN HDPE low-pressure sanitary sewer piping and associated structures; approx. 85 low-pressure sewer laterals; and restoration of areas disturbed by construction.
Posted Date
Dec 19, 2025
Due Date
Feb 3, 2026
Release: Dec 19, 2025
Close: Feb 3, 2026
The Project consists of the installation of approx. 5,165 LF of 1.5IN, 2IN, 3IN, and 4IN HDPE low-pressure sanitary sewer piping and associated structures; approx. 85 low-pressure sewer laterals; and restoration of areas disturbed by construction.
AvailableWork includes installation of approximately 2,200 LF of 6" water main, fire hydrant, two road bores, miscellaneous valves, fittings and accessories, water service reconnection, misc. Asphalt replacement.
Posted Date
Jan 22, 2026
Due Date
Feb 10, 2026
Release: Jan 22, 2026
Close: Feb 10, 2026
Work includes installation of approximately 2,200 LF of 6" water main, fire hydrant, two road bores, miscellaneous valves, fittings and accessories, water service reconnection, misc. Asphalt replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis